Skip to main content

Form library · Fire safety

AOV and smoke vent inspection checklist

A test and inspection record for automatic opening vents (AOVs) and smoke control. Record the system, whether the building is a high-rise residential building and the maximum opening time from the O&M manual, then the control panel, battery backup, detector and fire service switch, and reset. Add each vent with whether it opens fully and how many seconds it takes, obstructions and the actuator, with photos. For a window or roof vent, measure the frame opening with a tape or from a photo and the form checks it against the design free area. The form counts the vents tested, the slow ones and every defect, and records who will fix faults and any report to the fire and rescue service. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the AOV inspection on your phone now

See how the AOV inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

How are AOVs and smoke vents tested?

The form records activation from a smoke detector and the fire service override switch, whether each vent opens fully and how many seconds it takes, obstructions, the actuators and seals, the control panel and battery backup, and whether the system resets and the vents close afterwards. Article 17 of the Fire Safety Order requires fire safety equipment and devices, where needed to keep people safe, to be subject to a suitable system of maintenance and kept in efficient working order and good repair.

Last updated . Facts checked by the SiteSurvey team on 17 October 2026 against article 17 of the Regulatory Reform (Fire Safety) Order 2005 (maintenance), regulation 7 of the Fire Safety (England) Regulations 2022 (essential fire-fighting equipment), regulation 6 of the Fire Safety (England) Regulations 2022 (key fire-fighting equipment) and GOV.UK: fact sheet on lifts and essential fire-fighting equipment (regulation 7).

Built for testing smoke vents one by one

Test the controls, then add each vent as you open it. The form compares each opening time with the maximum from the O&M manual, checks a window or roof vent's measured frame opening against its design free area, and counts the vents and checks with a defect.

Clear frame opening width 0.72 m and height 0.87 m, each filled in from a measured photo with the photo as a thumbnail

Frame opening from a photo

Tape an A4 sheet to the wall beside the vent, photograph it square on and mark the sheet, then the inside of the frame. Good for spotting a restrictor or the wrong vent; the design free area still comes from the smoke control design. It works on web forms in any phone browser today, and the app version is on its way.

How measuring from a photo works →
Design free area 0.5 m², a frame opening area worked out as 0.63 m² and the check At least the design free area

Opening against the design free area

Enter the design free area from the O&M manual. The form works out the frame opening area and flags a frame smaller than the design free area, which cannot give the free area it was designed for.

How calculated fields work →
Counts worked out as 3 vents tested, 2 with a defect, 1 slower than the maximum, 0 openings smaller than the design and 3 defects found, with an amber note to record each one

Slow vents and defects counted

The form checks each vent's opening time against the maximum you enter, then counts the vents tested, the vents with a defect, the slow ones and every control or vent check that failed.

How calculated fields work →

A completed AOV inspection

A fictional block of flats: the Stair A roof vent took 74 seconds against 60 in the O&M manual, a planter was blocking a corridor window, and the Stair B landing window was measured at about 0.72 by 0.87 m from a photo against a 0.5 m² design free area. Open it as a filled-in form, or switch to a blank copy and try it yourself.

A top-hung window smoke vent open at a stair landing with an A4 sheet on the wall beside it, marked up to give a frame opening about 0.72 m wide
Stair B landing vent · about 0.72 m wide
The same window vent standing open under its chain actuator, with the A4 sheet taped to the painted brick wall
Opened in 32 seconds from the detector
A window AOV opening on its chain actuator

Try the AOV inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Smoke Vent and AOV InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed AOV inspection report (PDF), made by SiteSurvey from a fictional site visit.

Every question in the AOV inspection template

A smoke vent and AOV inspection: control panel and power, detector and switch activation, each vent opening fully and resetting, obstructions, faults and the reporting rules for high-rise residential buildings. 3 sections and 53 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Client: the project's customer
  • Site: the site, when the form is opened for a space or a product
  • Site address: the site address, from the space or the project

System

  • ProjectShort answer
    Fills in from the project name
  • ClientShort answer
    Fills in from the project's customer
  • Site*Short answer
    Fills in from the site, when the form is opened for a space or a product
  • Site addressShort answer
    Fills in from the site address, from the space or the project
  • Test date*Date
  • Engineer*Short answer
  • Company and competence (for example scheme or manufacturer training)Short answer
  • SystemChoose one
    • Natural smoke vents (AOVs)
    • Mechanical smoke extract
    • Smoke shaft
    • Pressurisation system
  • Maximum opening time (seconds)Number

    From the system design, O&M manual or manufacturer. The form compares each vent's opening time with it.

  • Is it a residential building with two or more flats, at least 18 m high or with at least 7 storeys?Yes or No
  • CheckRegulation 7, Fire Safety (England) Regulations 2022: in high-rise residential buildings, smoke control systems and the fire detection linked to them are essential fire-fighting equipment. The responsible person must check them every month, record the checks and make the record available to residents, and report to the fire and rescue service by electronic means any fault not fixed within 24 hours, and again when it is fixed.
    Shown when “Is it a residential building with two or more flats, at least 18 m high or with at least 7 storeys?” is Yes
  • GuidanceArticle 17 of the Fire Safety Order: where needed to keep people safe, fire safety equipment and devices must be subject to a suitable system of maintenance and kept in an efficient state, in efficient working order and in good repair.
  • GuidanceNatural smoke vents (AOVs and roof vents) are made and tested to BS EN 12101-2 (natural smoke and heat exhaust ventilators). BS 9999:2017 (non-residential) and BS 9991:2024 (residential) recommend routine testing by the occupier and periodic servicing by a competent specialist, normally at least once a year, following the installer or manufacturer schedule. Record the test, the faults and what was done.

Controls

  • Control panel healthy, no faults showingChoose one
    • OK
    • Defect
  • Battery backup testedChoose one
    • OK
    • Defect
  • Activates from the smoke detectorChoose one
    • OK
    • Defect
  • Fire service override switch worksChoose one
    • OK
    • Defect
    • Not fitted
  • System resets and vents close afterwardsChoose one
    • OK
    • Defect
  • Control checks with a defectWorked out by the form

Vents

  • Vents by stair, level or area
    Repeat for each entry. Each one asks:
    • Stair, level or area*Short answer

      For example Stair A, Level 4 lobby or Car park

    • Vents in this area
      Repeat for each vent. Each one asks:
      • Position (stair head, corridor, lobby)*Short answer
      • TypeChoose one
        • Window AOV
        • Roof vent
        • Damper
        • Fan
      • Opens fullyChoose one
        • OK
        • Defect
      • Time to open (seconds)Number
      • Opening time checkWorked out by the form
        Shown only when the answers above make it relevant
      • Clear of obstructionsChoose one
        • OK
        • Defect
      • Actuator, chain and sealsChoose one
        • OK
        • Defect
      • Clear frame opening width (m)Number

        Inside the frame, with a tape or measured from a photo with an A4 sheet taped to the wall beside the vent.

        Shown only when the answers above make it relevant
      • Clear frame opening height (m)Number
        Shown only when the answers above make it relevant
      • Design free area (m²)Number

        From the smoke control design or O&M manual.

        Shown only when the answers above make it relevant
      • Frame opening area (m²)Worked out by the form
        Shown only when the answers above make it relevant
      • Opening against the designWorked out by the form
        Shown only when the answers above make it relevant
      • CheckThe frame opening is smaller than the design free area, so the vent cannot give the free area it was designed for. Check for a restrictor, a partly opening actuator or the wrong vent, and refer it to the smoke control engineer.
        Shown only when the answers above make it relevant
      • What is wrong?Short answer
        Shown only when the answers above make it relevant
      • Checks with a defectWorked out by the form
      • PhotosPhotos
    • This stair, level or area: vents testedWorked out by the form
    • This stair, level or area: vents with a defectWorked out by the form
    • This stair, level or area: vents slower than the maximumWorked out by the form
    • This stair, level or area: openings smaller than the designWorked out by the form
    • This stair, level or area: defects found (controls and vents)Worked out by the form
  • Vents testedWorked out by the form
  • Vents with a defectWorked out by the form
  • Vents slower than the maximumWorked out by the form
  • Openings smaller than the designWorked out by the form
  • Defects found (controls and vents)Worked out by the form
  • CheckDefects found. Record each one, what was done on the day and what is still needed, and who will fix it by when.
    Shown only when the answers above make it relevant
  • Result*Choose one
    • In efficient working order
    • Faults found
  • Faults and actionNotes
    Shown when “Result” is “Faults found”
  • Who will fix the faults, and by whenShort answer
    Shown when “Result” is “Faults found”
  • Will the faults be fixed within 24 hours?Yes or No
    Shown when “Result” is “Faults found” and “Is it a residential building with two or more flats, at least 18 m high or with at least 7 storeys?” is Yes
  • WarningReport the fault to the local fire and rescue service by electronic means as soon as reasonably practicable, and report again when it is fixed.
    Shown when “Will the faults be fixed within 24 hours?” is No
  • When and how the fire and rescue service was toldShort answer
    Shown when “Will the faults be fixed within 24 hours?” is No
  • Completed byWorked out by the form
  • Next monthly check dueDate

    Regulation 7 of the Fire Safety (England) Regulations 2022: every month in high-rise residential buildings.

    Shown when “Is it a residential building with two or more flats, at least 18 m high or with at least 7 storeys?” is Yes
  • Days to the next monthly checkWorked out by the form
    Shown when “Is it a residential building with two or more flats, at least 18 m high or with at least 7 storeys?” is Yes and “Test date” is answered and “Next monthly check due” is answered
  • CheckThe next due date is before the date of this visit. Check the date.
    Shown only when the answers above make it relevant
  • Next specialist service dueDate

    Set by the duty holder or manufacturer, normally at least once a year.

  • Days to the next serviceWorked out by the form
    Shown when “Test date” is answered and “Next specialist service due” is answered
  • CheckThe next due date is before the date of this visit. Check the date.
    Shown only when the answers above make it relevant
  • Engineer signatureSignature

See it filled in

A completed AOV inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

AOV inspection FAQs

What applies in high-rise flats?

In high-rise residential buildings in England (two or more flats, at least 18 metres or 7 storeys), smoke control systems and the fire detection linked to them are essential fire-fighting equipment. The responsible person must check them every month, record the checks and make the record available to residents, and report to the fire and rescue service any fault not fixed within 24 hours, and again when it is fixed.

What if a vent is blocked?

Record what is blocking it and clear it, for example furniture or planters in front of a window AOV. Tell residents if the obstruction came from a flat.

Does it record opening times?

Yes. Record the seconds each vent takes to open, so slow actuators show up between visits.

Does it cover mechanical systems?

It records the system type, including mechanical extract, smoke shafts and pressurisation, but follow the manufacturer's procedure for those systems.

Who signs it?

The engineer signs, and the record goes to the responsible person as a PDF or a link.

Who uses this?

Smoke control and fire protection contractors, building managers, housing providers and managing agents.

Related

Use this AOV inspection form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →