RAMS for construction contractors
RAMS software that the crew reads and signs before work starts.
Most RAMS are copied from the last job, emailed as a PDF and signed by whoever is in the cabin. Write this job's RAMS instead: choose the type of work, add the hazards the form suggests, tick their controls from a library, set out the method step by step, then brief the crew and have every one of them sign on the device before work starts.
The Works £25 per user per month when billed annually (Base from £13) · trial from £1, cancel any time

9
Hazards with controls
6
Work steps
4
Crew signatures
One RAMS for a flat roof at a school sports hall, the sample report below
What is RAMS in construction?
RAMS stands for risk assessment and method statement. The risk assessment identifies a job's hazards and the controls needed. The method statement sets out, step by step, how the job will be done safely with those controls. HSE says method statements are not required by law, although they are prepared for many construction activities. The risk assessment is a legal duty.
Last updated . Facts checked on 9 November 2026 against HSE on construction health and safety paperwork and regulation 3 of the Management of Health and Safety at Work Regulations 1999.
Risk assessment, method statement and RAMS: which is which?
The two documents do different jobs. RAMS is the usual name for them together, often asked for by a principal contractor or client before a contractor starts.
| Risk assessment | Method statement | |
|---|---|---|
| What it does | Identifies the hazards, who might be harmed and the controls needed | Sets out in order how one job will be done safely, with the controls at each step |
| Required by law? | Yes, a suitable and sufficient assessment (MHSWR 1999, regulation 3) | Not for most work. Demolition and dismantling arrangements must be in writing (CDM 2015, regulation 20) |
| Scope | A site, workplace or activity | One task, one crew, one set of dates |
| In SiteSurvey | Our risk assessment app, hazard by hazard, with suggested controls | The RAMS form puts both in one document: hazards and controls, then steps, hold points, briefing and sign-off |
Sources: HSE on construction health and safety paperwork, regulation 3 of the Management of Health and Safety at Work Regulations 1999 and CDM 2015, regulation 20.
SiteSurvey for RAMS, at a glance
- What RAMS is
- Risk assessment and method statement: the hazards and controls for a job, and the step-by-step method for doing it safely.
- Other names
- Safe work method statement (SWMS) in Australia, job hazard analysis (JHA) or job safety analysis (JSA) in the US, field level hazard assessment (FLHA) in Canada, and site specific safety plan (SSSP) or task analysis in New Zealand. The law behind each is different.
- What it is
- A mobile inspection and forms app for iOS and Android, with a web portal, used to write, brief and sign method statements on site.
- Who it is for
- Contractors, subcontractors, supervisors and site managers who write RAMS for a job and brief the crew before work starts.
- What it records
- Job and CDM details, crew and competence, hazards with controls and scores, each step with its hold point, permits, emergencies, briefing signatures and approval.
- Suggestions
- Likely hazards for the type of work, controls to tick from a library of 25 hazards and 159 controls, and AI first drafts of the hazard and control text on the web form. You accept or change every one.
- Price
- £25 per user per month on The Works plan, billed annually, plus VAT. It includes the form builder and reports. Trial from £1, cancel any time.
- What it does not do
- It does not write the whole RAMS, judge whether it is adequate, keep pre-written method statements to file under your name, or run a document approval workflow.
A RAMS pack nobody reads protects nobody.
Construction RAMS often grow into long documents written for the approver rather than the crew. When something goes wrong, the questions are practical ones: did the method match the job, were the controls in place at each step, was the crew competent and supervised, and had they been told what was in it.
Copied from the last job
A method statement lifted from another site describes another site. The steps, the access and the crew need to be this job's.
Written for the approver
Pages of generic text get the pack approved but are hard to brief. Short steps with their own hazards and controls are easier to explain.
Signed after the event
A sign-on sheet collected at the end of the week says little about what the crew knew before they started.
How do you write and brief RAMS with an app?
01 · Describe the job
Type of work, scope, site, dates, the CDM role and the construction phase plan reference. The type of work tailors every later page.02 · Assess the hazards
Add the hazards the form suggests for this job, tick their controls from the library, say how they apply here and score each one.03 · Write the steps
One entry per step, in the order the work is done, each with its hazards, controls, photos or drawings and any hold point.04 · Brief, approve and send
Brief the crew on site and have each person sign on the device. The author and an approver sign, and the RAMS goes out as a PDF or a link.Walk Cam, point by point
The RAMS, checked against the job.
Walk Cam takes the supervisor round the points the method statement names before and during the work, films what is there and writes down what they say.

Point 2 of 3
Hold point
The edge protection checked before the next step starts.

Point 3 of 3
Emergency arrangements
First aid and welfare shown to the crew where the RAMS says they are.
What the report looks like
What a finished RAMS looks like.
This is a completed RAMS from the SiteSurvey form library, made with the report builder: replacing the felt roof on a school sports hall. Scroll through it here or download the PDF.
- 1The job and the crewScope, dates, CDM role and construction phase plan, then each person's cards, competence and any supervision.
- 2Hazards and controlsEach hazard with the controls ticked, how they apply on this roof, the score and any further action.
- 3Step by stepEach step in order with how it is done, its hazards, its controls, photos and the hold point before the next.
- 4Briefed, signed and approvedWho briefed the crew and when, each crew signature, and the author's and approver's dated sign-off.























Try the form
The form behind the report. Open it and try it.
A live SiteSurvey RAMS form, shared by link with no login. Choose the type of work and it asks only what applies, suggests the likely hazards, offers controls to tick, takes a separate entry for each step and each crew member, and counts what still needs resolving. Answers are cleared every night.
Open the live form →See every question in the RAMS template →Want to see one filled in? The completed sample RAMS is read-only and fictional. See the finished record →

Tailored to the trade
One question on the first page, type of work, changes the hazards, cards, plant, permits and PPE offered on every later page.
More than Walk Cam
Build the form. Share it by link.
Walk Cam films the checks the method statement names. The form behind it is yours to build, and the walk and the form can each be sent to someone outside your team as a link, with no login or app needed.

Build your RAMS form with AI
Start from the RAMS template, or describe how your company writes RAMS and the AI assistant builds the form: steps with their own hazards and controls, hold points, crew signatures and notices that appear when something is missing. Refine it in chat or edit it visually.
How the form builder works →

Share by link, no login needed
Make any form shareable and SiteSurvey gives it a unique URL, with an optional password. Customers, tenants or contractors fill it in on their phone’s browser, and their answers land in the same project. Walk Cam recordings and finished reports can be shared the same way, by link or by email.
How Walk Cam sharing works →What should RAMS software record?
The RAMS is a form like any other in SiteSurvey, so it carries the same photos, logic, signatures and offline working as the rest of your site record, and reaches the report the same way.
Controls to tick
Pick a hazard and its controls appear as a tick list, each tagged by the hierarchy of controls. Add your own and say how they apply on this job.
Steps with their own controls
Each step in the sequence holds its hazards, controls and photos, so the crew can be briefed one step at a time.
Hold points
Mark the steps that must be checked before work moves on, and record what is checked and by whom.
Crew and competence
Record each person's cards and their earliest expiry, and the training or supervision for anyone still gaining the skills.
Checks that flag gaps
The form raises a notice for a hazard relying on PPE alone, a hot works step with no permit, a card that expires before the start, or fewer signatures than crew.
Signed on the device
Briefing, author and approver signatures are captured on site, timestamped, with no paper sheet to chase.
Works with no signal
Brief and sign in a basement or on a new-build plot, and let it sync when the device is back online.
Suggested, not written for you
Suggested hazards and controls, then your judgement.
Tell the RAMS form the type of work and the scope, and it lists the hazards that are likely on this job. Add one and the form offers its controls as a tick list from our hazard and control library: 25 hazards and 159 controls, each tagged by the hierarchy of controls, from eliminate down to PPE. If a hazard is left with PPE alone, the form says so and counts it on the approval page.
On the web form, AI writes a first draft of each hazard description and of how the controls apply on this job. You accept it, rewrite it or ignore it. Nothing is saved until you do.
The judgement stays with the person who signs. SiteSurvey does not write the whole RAMS, does not decide whether the controls are enough, and does not file a pre-written method statement under your name.
Tailored to the trade
Construction, electrical and M&E, AV and IT, roofing and scaffolding, facilities, events or grounds work. The choice changes the hazards, cards, plant, permits and PPE offered.
Likely hazards first
Work at height for a roofer, live working for an electrician, rigging for an events crew. Each suggestion drops off the list once you add it.
Scored 1 to 5
Likelihood and severity for each hazard, with the band worked out. A hazard still rated high after its further action is counted before work starts.
RAMS management
Managing RAMS from subcontractors.
Send the RAMS form to a subcontractor as a link. They fill it in and sign it in a browser, with no account and no app. Every subcontractor answers the same questions, so you are not comparing a 40 page PDF with a two page one.
The form flags what a principal contractor checks for before work starts: a hazard with no controls, a hazard still rated high, a hot works step with no permit, a card that expires before the start date, fewer briefing signatures than people on the crew, no approver, and an approval dated after the start. The approval page counts them. Every finished RAMS sits on the project with its dates, author and approver.
There is no separate approval queue or version register. Approval is a signature and a date in the form, and a revised RAMS is a new submission on the same project.
Buyer's checklist
What to look for in RAMS software.
Whether you search for RAMS software or method statement software, the test is the same: does the crew read it, and can you prove they did. SiteSurvey does all six of these.
Both halves in one document
The hazards with their controls, and the method step by step, checked against each other before anyone signs.
Questions that fit the trade
An electrician is not asked about tree felling, and a roofer sees fragile roofs and hot works.
Controls you tick
A tick list per hazard instead of paragraphs pasted from the last job.
Signed before work starts
Each person signs on the device at the briefing, not on a sheet at the end of the week.
Works with no signal
Fill in, brief and sign in a basement or a plant room, then sync.
Opens without an account
A PDF or a link the principal contractor or client opens in a browser.
SiteSurvey is not a document management system. If you need version control across hundreds of contractors, pair it with one.
Start from the ready-made RAMS form.
Open the RAMS form from the form library: risk assessment and method statement in one document, tailored to your trade, with suggested hazards and controls to tick. Or use the separate method statement and risk assessment forms. Every field is editable, in chat with the AI assistant or visually. See every question on the RAMS template page.
Job, site, dates and CDM role
Crew, cards and competence
Suggested hazards, controls to tick, 1 to 5 scores
Sequence of work, step by step
Hazards, controls and hold points per step
Plant, access, COSHH and PPE
Permits, first aid, emergency and rescue
Briefing, crew signatures and approval
Try it on your phone
Try it on this phone
Fill in the RAMS template on your phone now
See how the RAMS template looks on your phone
Scan the code with your phone camera. It opens the real form, no sign-up needed.
Open the live example and fill it in, just as your team would on site. No sign-up needed.
See it on this phoneEvery question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.
What is RAMS software?
RAMS software lets a contractor write the risk assessment and method statement for a job on a phone, tablet or computer, brief the crew from it and collect their signatures, then send the finished RAMS document as a PDF or link. In SiteSurvey the RAMS is one form: the job details, the crew and their competence, the hazards with suggested controls to tick, each step in order with its hazards and controls, permits, emergency arrangements, the briefing and the approval.
What does RAMS stand for?
RAMS stands for risk assessment and method statement. It is the name used across the construction industry for the two documents together, not a term from the law. The risk assessment identifies the hazards and the controls. The method statement sets out, in order, how the job will be done safely with those controls in place. Our RAMS template puts both in one form, tailored to your trade.
What is RAMS called in other countries?
RAMS is a UK name. In Australia the nearest document is a safe work method statement (SWMS), which the Work Health and Safety Regulations require before high risk construction work. In the US the usual names are a job hazard analysis (JHA) or job safety analysis (JSA), and in Canada a field level hazard assessment (FLHA) is done on site before each task. New Zealand contractors write a site specific safety plan (SSSP) and a task analysis (TA) for each job. Ireland uses RAMS and method statements as the UK does, alongside the employer's safety statement under section 20 of the Safety, Health and Welfare at Work Act 2005 (there is a separate Irish safety statement template for it), and its construction regulations name a PSDP and PSCS rather than the CDM roles. In South Africa, the Construction Regulations 2014 call for a baseline risk assessment from the client and a health and safety plan and file, and contractors write method statements as in the UK. In India, JHA, JSA and HIRA (hazard identification and risk assessment) are the usual names. In the UAE and the wider Gulf, RAMS and method statements are used much as in the UK, alongside a project HSE plan and local frameworks such as OSHAD in Abu Dhabi. In Singapore, the Workplace Safety and Health (Risk Management) Regulations require a risk assessment, often backed by safe work procedures and a permit to work. They share the same idea, the steps of a job with each step's hazards and controls, but the law behind each one differs, so check the local rules before using a UK RAMS abroad.
Is a method statement a legal requirement?
Not for most work. HSE says method statements are not required by law, although they are prepared for many construction activities. The legal duties behind them are a suitable and sufficient risk assessment, under regulation 3 of the Management of Health and Safety at Work Regulations 1999, and the information, instruction, training and supervision needed, under section 2 of the Health and Safety at Work etc. Act 1974. One exception: under regulation 20 of CDM 2015, the arrangements for demolition or dismantling a structure must be recorded in writing before the work begins.
What is the difference between RAMS and a risk assessment?
A risk assessment is the employer's assessment of the hazards of a site or activity and the controls needed. RAMS add the method statement: how one particular job will be carried out, step by step, by a named crew, with each step's controls, permits and hold points. The method statement shows how the controls are put into practice and does not replace the assessment. For a general site or workplace assessment, hazard by hazard, see our risk assessment app.
What should a method statement include?
It should cover the scope of the work, the site and dates, who supervises and who does the work, and then each step in order with its hazards and controls. It should also cover plant, access equipment, materials and PPE, any hazardous substances and their COSHH references, permits, first aid, emergency and rescue arrangements, waste, the crew briefing and the approval. The sample report above is a completed SiteSurvey method statement with all of these.
How does the crew sign the RAMS?
The briefing section records who briefed the crew and when, any language or format needs, questions the crew raised, and that they have been told to stop and report if the work or conditions change. Each person then signs on the phone or tablet. The form compares the number of signatures with the number of people on the crew and flags anyone who has not signed.
Can the principal contractor or client approve it?
The form records who wrote the method statement and who approved it, with dates and signatures, and flags an approval dated after the start date. You can send the finished RAMS as a PDF or a share link, or share the form by link so someone without an account can fill in or sign their part in a browser. SiteSurvey does not run a separate document approval workflow or keep a register of document versions.
Is it a RAMS generator? Can AI write my RAMS?
Not the whole thing. The RAMS form suggests the hazards that are likely for the type of work and the scope, offers each hazard's controls as a tick list from a library of 25 hazards and 159 controls, and on the web form AI writes a first draft of the hazard description and of how the controls apply. You accept, rewrite or ignore every suggestion. The form flags gaps such as a hazard relying on PPE alone or an unsigned crew member, and turns the answers into a clean report. Whether the RAMS is adequate for the job stays with you.
What does CDM 2015 say about briefing the crew?
Regulation 15 of CDM 2015 says a contractor must give each worker under their control appropriate supervision, instructions and information. That information must include a suitable site induction where the principal contractor has not already given one, the procedures for serious and imminent danger, and the risks identified by the risk assessment. A contractor must also not appoint anyone who does not have, or is not in the process of obtaining, the skills, knowledge, training and experience for their tasks.
Sources: CDM 2015, regulation 15, CDM 2015, regulation 20 and section 2 of the Health and Safety at Work etc. Act 1974.
Does it work without a signal?
Yes. The method statement, its photos, Walk Cam clips and every signature are completed on the device and synced to the project when it is back online, so briefings in basements, plant rooms and new-build plots are no obstacle.
How much does it cost?
Pricing is per user, not per document or site. The Works plan, which includes the custom form builder and reports used for RAMS, is £25 per user per month, billed annually, plus VAT. The Base plan starts at £13 per user per month. Every plan starts with a trial from £1, cancel any time.