Form library · Construction and handover

Window installation checklist

For installers and inspectors recording a window installation. Record the opening and product, check the fitted frame size against the schedule and its tolerance, then the fixing, sealing, glazing and operation checks and the measured evidence. Log each defect with a photo and, for a seal gap or a crack, its length measured from the photo. The form tallies the checks, the measurements outside their criterion and the open defects, and holds sign-off until they are cleared. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the window installation inspection on your phone now

See how the window installation inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

Does a checklist replace building control requirements?

GOV.UK Approved Documents provide guidance on meeting Building Regulations requirements in England. Relevant requirements depend on the work and location. Record the approved design and product instructions; a checklist is not building control approval.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against GOV.UK Approved Documents for England and HSE designer duties.

Built for checking a window as it goes in

Fill the record in at the opening as the installer finishes. Compare the fitted frame with the schedule, log each defect with a photo and its length, and the form tallies the checks, measurements and open defects and holds sign-off until they are cleared. It records the installation; it is not a competent person scheme certificate.

Size tolerance 5 mm, width difference -4 mm, height difference -3 mm and the frame size check Within the tolerance

Frame size against the schedule

Enter the frame size on the schedule, the fitted size from a tape and the tolerance from the schedule or the manufacturer. The form works out the difference each way and says whether the frame is within the tolerance.

How calculated fields work →
A sealant defect at the outside sill with Length of the affected area 0.04 m and the marked-up measuring photo as a thumbnail

Defect length from a photo

For a gap in a seal, a crack or a damaged length, photograph it square on with an A4 sheet against the frame and tap both ends. The length goes with the defect so the installer knows what to fix. It works on web forms in any phone browser today, and the app version is on its way.

How measuring from a photo works →
Tallies: 3 checks acceptable of 5, 2 needing action, 0 not done, 2 measurements within the criterion, 1 outside, 2 defects still open, 1 fixed and rechecked and 40 mm of open defect length

Tallies and a hold on sign-off

The form counts the checks by result, the measurements inside and outside their criterion and the defects still open. Any action, measurement outside its criterion or open defect shows a not ready to sign off note.

How calculated fields work →

A completed window installation inspection

A replacement window in a fictional terraced house: the frame within 5 mm of the schedule, a seal gap at the sill of about 40 mm measured from a photo, a restrictor that does not engage and a reveal crack already made good. Open it as a filled-in form, or switch to a blank copy and try it yourself.

The outside sill of a new white window with the silicone bead stopping short at the left, marked up to give a gap of about 0.04 m against an A4 sheet taped to the frame
Sill seal gap · about 40 mm · open
A new window frame with fixings and foam visible in the brick reveal before it is made good
Fixings before the reveal was made good
A new window and its sill

Try the window installation inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Window Installation InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed window installation inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the window installation inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Window Installation Inspection form in the SiteSurvey app on a tablet
The Window Installation Inspection form in the SiteSurvey app on a phone

Every question in the window installation inspection template

A window installation record linking opening IDs, product information, fixing and sealing observations, operation checks, defects and handover evidence. 6 sections and 65 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer
  • Window type, manufacturer and product reference: the product it is opened for

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckFor installation quality records. This is not a FENSA or other competent-person certificate, glazing design, fire performance assessment or proof of compliance in every jurisdiction.
  • CheckReplacement windows in England are controlled work under the Building Regulations 2010, unless a competent person scheme installer self-certifies them. The main guidance: Approved Document L (2021) for energy, a replacement window in a dwelling needs a U-value of 1.4 W/m²K or better, or Window Energy Rating band B or better; Approved Document F for ventilation, the replacement must not make ventilation worse, so fit background (trickle) ventilators where the old window had them or the room needs them; Approved Document K for safety glazing in critical locations; and Approved Document B for escape windows, which must keep a clear openable area of at least 0.33 m² and at least 450 mm high and wide. BS 8213-4 is the code of practice for surveying and installing replacement windows and doorsets. A checklist is not building control approval.
  • Weather on siteAnswer

Opening and product

  • Opening ID, elevation and room*Short answer
  • Window type, manufacturer and product reference*Short answer
    Fills in from the product it is opened for
  • Approved details and instruction revision*Short answer
  • Building control or scheme reference where relevantShort answer
  • Frame width on the schedule (mm)Number
  • Frame height on the schedule (mm)Number
  • Frame width as fitted (mm)Number

    Tape the fitted frame. A photo estimate is not close enough for this check.

  • Frame height as fitted (mm)Number
  • Size tolerance from the schedule or the manufacturer (± mm)Number

    If the size check shows outside the tolerance, record it under measured evidence below.

  • Width difference (mm)Worked out by the form
    Shown only when the answers above make it relevant
  • Height difference (mm)Worked out by the form
    Shown only when the answers above make it relevant
  • Frame size checkWorked out by the form
    Shown only when the answers above make it relevant

Installation observations

  • Opening condition and dimensions checked against design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Frame alignment and fixing evidence recorded*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Perimeter weathering, sealing and drainage details checked*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Glazing and safety markings checked against specification*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Operation, hardware and restrictors checked to specification*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant

Measured evidence

  • Installation measurement
    Repeat for each installation measurement. Each one asks:
    • Measurement point and parameter*Short answer
    • Actual result and unit*Short answer
    • Acceptance criterion and source*Short answer
    • Instrument and calibration referenceShort answer
    • Comparison*Choose one
      • Within criterion
      • Outside criterion
      • Unable to assess
    • Exception and response*Notes
      Shown only when the answers above make it relevant
  • Defects found
    Repeat for each defect. Each one asks:
    • Where (for example outside sill, left jamb)*Short answer
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • TypeChoose one
      • Sealant or weathering
      • Fixing or packing
      • Glazing
      • Hardware or operation
      • Finish or making good
      • Damage
      • Other
    • What is wrongNotes
    • Length of the affected area (m)Number

      For a gap in a seal, a crack or a damaged length. Photograph it square on with an A4 sheet against the frame as the reference, or use a tape.

    • PhotosPhotos
    • Status*Choose one
      • Open
      • Fixed and rechecked
  • Fixings and seals before concealmentPhotos

    Capture the relevant location and specification before details are hidden. Record any unobserved installation stage as a limitation.

Handover

  • Adjustments made and reinspection notesNotes
  • Product, warranty and separate certificate referencesShort answer
  • Handover recipientShort answer
  • Handover recipient signatureSignature

Actions and review

  • Checks acceptable (of 5)Worked out by the form
  • Checks needing actionWorked out by the form
  • Checks not doneWorked out by the form
  • Measurements within the criterionWorked out by the form
  • Measurements outside the criterionWorked out by the form
  • Defects still openWorked out by the form
  • Defects fixed and recheckedWorked out by the form
  • Open defect length (mm)Worked out by the form
    Shown only when the answers above make it relevant
  • CheckNot ready to sign off. Some checks need action, a measurement is outside its criterion or a defect is still open. Record the fix and the recheck before the record is marked ready for review.
    Shown only when the answers above make it relevant
  • GuidanceAll five checks acceptable, no measurement outside its criterion and no open defects.
    Shown only when the answers above make it relevant
  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidenceNotes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

For installation quality records. This is not a FENSA or other competent-person certificate, glazing design, fire performance assessment or proof of compliance in every jurisdiction.

What a useful entry looks like

Fixings and seals before concealment

Capture the relevant location and specification before details are hidden. Record any unobserved installation stage as a limitation.

Opening W-14 photographed before internal finishes conceal the installation details. Images are linked to the approved detail and inspection record.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed window installation inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Window Installation Inspection FAQs

How should I record “Fixings and seals before concealment”?

Capture the relevant location and specification before details are hidden. Record any unobserved installation stage as a limitation.

Can concealed fixings be marked acceptable?

Only where there is suitable inspection evidence. Record limitations and photographs before concealment where possible.

Are universal fixing distances supplied?

No. Record the project and manufacturer criteria for the specific product and substrate.

Does this issue a scheme certificate?

No. Link the separate certificate from the authorised issuer where applicable.

What are the limits of this template?

For installation quality records. This is not a FENSA or other competent-person certificate, glazing design, fire performance assessment or proof of compliance in every jurisdiction.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.