Pressure system inspection record

An examination record for a pressure system under the Pressure Systems Safety Regulations 2000. Record the system and its written scheme of examination, then each item: scan its data plate, record the safe operating limit and the normal operating pressure, and the safety valve set pressure against the figure in the scheme. The form flags an item running above its limit or a valve set differently from the scheme, counts items satisfactory, needing repairs and unsafe, and shows the days from examination to report against the 28 days in regulation 9. It records the competent person's examination; it is not the written scheme. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the pressure system inspection on your phone now

See how the pressure system inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

What is a written scheme of examination?

Under the Pressure Systems Safety Regulations 2000, a written scheme of examination identifies the items in a pressure system, the parts to examine, the nature of each examination including tests of protective devices, the preparation needed, the maximum interval between examinations, and the competent person who certified it. A competent person then examines the system in line with the scheme and reports.

Last updated . Facts checked by the SiteSurvey team on 17 October 2026 against regulation 8 of the Pressure Systems Safety Regulations 2000 (written scheme of examination), regulation 9 of the Pressure Systems Safety Regulations 2000, regulation 10 of PSSR 2000 (action in case of imminent danger) and HSE INDG178: written schemes of examination.

Built for examining pressure systems

Examine each item against the written scheme with the form on a phone. Record the safe operating limit and the normal operating pressure, and the safety valve set pressure against the figure in the scheme. The form flags an item above its limit or a valve set differently, counts the items satisfactory, needing repairs and unsafe, and shows the days to the report against the 28 days in PSSR regulation 9. It records the competent person's examination; it is not the written scheme.

3 items examined, 1 satisfactory, 1 unsafe, 1 needing repairs, 0 operating above the limit and 1 safety valve differing from the scheme, with an amber note

Every item counted

The form counts the items examined, satisfactory, needing repairs and unsafe, the items running above their safe operating limit and the safety valves set differently from the written scheme.

How calculated fields work →
Safety valve set pressure 9 bar against 8 bar in the written scheme, Differs

Safety valve against the scheme

Enter the pressure the valve lifted at and the set pressure in the written scheme, and the form shows whether they match. A valve set above the scheme stands out before the report is written.

How calculated fields work →
Safe operating limit 8 bar, normal operating pressure 7.5 bar, Within the limit

Operating pressure against the limit

Each item shows its normal operating pressure against its safe operating limit, with a red note when it runs above it.

How calculated fields work →
Date of the report 9 October 2026, 4 days from examination to report

Days to the report

The form shows the days from the examination to the report, and an amber note past the 28 days in regulation 9.

How calculated fields work →

A completed pressure system examination

A fictional engineering works' compressed air system: the main receiver needs a new auto drain, the pipework is satisfactory, and the paint shop receiver's safety valve lifted at 9.0 bar against 8.0 bar in the scheme, so the receiver was locked off as unsafe. Report written 4 days after the examination. Open it as a filled-in form, or switch to a blank copy and try it yourself.

A brass safety valve and pressure gauge on top of a grey air receiver, with a red tag hanging from the valve
AR2 safety valve · lifted at 9.0 bar, locked off
A vertical compressed air receiver in a compressor house
AR1 receiver · auto drain to replace
The compressor house and air receiver

Try the pressure system inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Pressure System Examination RecordOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed pressure system inspection report (PDF), made by SiteSurvey from a fictional site visit.

Every question in the pressure system inspection template

A pressure system examination record under PSSR: the written scheme, each item with its safe operating limit, protective devices, condition, repairs and dates, the next examination and the competent person's report. 3 sections and 52 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Client: the project's customer
  • Site: the site, when the form is opened for a space or a product
  • Site address: the site address, from the space or the project

System and scheme

  • ProjectShort answer
    Fills in from the project name
  • ClientShort answer
    Fills in from the project's customer
  • Site*Short answer
    Fills in from the site, when the form is opened for a space or a product
  • Site addressShort answer
    Fills in from the site address, from the space or the project
  • Examination date*Date
  • Competent person*Short answer
  • CompanyShort answer
  • System (for example compressed air system, steam boiler)*Short answer
  • Written scheme of examination referenceShort answer
  • Written scheme certified onDate
  • GuidanceHSE INDG178: a written scheme of examination identifies the items in the system, the parts to examine, the nature of each examination, including tests of protective devices, the preparation needed, the maximum interval between examinations, and the competent person who certified it.

Items examined

  • Items by plant room or area
    Repeat for each entry. Each one asks:
    • Plant room or area*Short answer

      For example Compressor house or Boiler room

    • Items examined here
      Repeat for each item. Each one asks:
      • Item*Short answer
      • Scan the data plateScan a label: serial number, asset number

        Optional. Scan the label or tag to capture its numbers.

      • TypeChoose one
        • Air receiver
        • Steam boiler
        • Autoclave or steriliser
        • Pressure vessel
        • Pipework
        • Safety valve
        • Other
      • Safe operating limit (bar)Number
      • Normal operating pressure (bar)Number

        As found on the gauge in normal running, or from the user's records.

      • Operating pressure against the limitWorked out by the form
        Shown when “Normal operating pressure (bar)” is answered and “Safe operating limit (bar)” is answered
      • WarningThe normal operating pressure is above the safe operating limit. Record the repairs, modifications or changes to the safe operating limit below.
        Shown only when the answers above make it relevant
      • it_op_flagWorked out by the form
      • Protective devices testedTick all that apply
        • Safety valve
        • Pressure gauge
        • Pressure switch
        • Low water alarm
        • Drain valve
      • Safety valve set pressure (bar)Number
        Shown when “Protective devices tested” includes “Safety valve”
      • Set pressure in the written scheme (bar)Number
        Shown when “Protective devices tested” includes “Safety valve”
      • Safety valve against the schemeWorked out by the form
        Shown when “Safety valve set pressure (bar)” is answered and “Set pressure in the written scheme (bar)” is answered
      • it_sv_flagWorked out by the form
      • Condition*Choose one
        • Satisfactory
        • Repairs needed
        • Unsafe: do not use
      • Repairs, modifications or changes to safe operating limitsNotes
        Shown only when the answers above make it relevant
      • Complete repairs byDate
        Shown when “Condition” is “Repairs needed”
      • WarningImminent danger (PSSR regulation 10). The competent person must give the user a written report straight away, specifying the repairs, modifications or changes needed, and send the same particulars to the enforcing authority within 14 days. The system, or that part of it, must not be operated until they are done.
        Shown when “Condition” is “Unsafe: do not use”
      • Do not operate after (next examination due)Date
      • Days to the next examinationWorked out by the form
        Shown when “Examination date” is answered and “Do not operate after (next examination due)” is answered
      • it_due60_flagWorked out by the form
      • PhotosPhotos
    • This plant room or area: items examinedWorked out by the form
    • This plant room or area: items satisfactoryWorked out by the form
    • This plant room or area: items unsafeWorked out by the form
    • This plant room or area: items needing repairsWorked out by the form
    • This plant room or area: operating above the limitWorked out by the form
    • This plant room or area: safety valves differing from the schemeWorked out by the form
    • This plant room or area: next examination due within 60 daysWorked out by the form
  • Items examinedWorked out by the form
  • Items satisfactoryWorked out by the form
  • Items unsafeWorked out by the form
  • Items needing repairsWorked out by the form
  • Operating above the limitWorked out by the form
  • Safety valves differing from the schemeWorked out by the form
  • Next examination due within 60 daysWorked out by the form
  • CheckAn item is running above its safe operating limit, or a safety valve is set differently from the written scheme. Record the action needed in the item and in the report.
    Shown only when the answers above make it relevant

Report

  • Is the written scheme still suitable?Choose one
    • Suitable
    • Should be modified
  • Changes needed to the schemeNotes
    Shown when “Is the written scheme still suitable?” is “Should be modified”
  • CheckPSSR regulation 9: the competent person sends a signed, dated written report to the user (or the owner of a mobile system) as soon as practicable, to arrive within 28 days of the examination, or before the date set in the report for repairs, if that is sooner.
  • Date of the reportDate
  • Days from examination to reportWorked out by the form
    Shown only when the answers above make it relevant
  • CheckMore than 28 days after the examination. PSSR regulation 9 asks for the report to reach the user within 28 days of the examination, or sooner if repairs are due first.
    Shown only when the answers above make it relevant
  • Examiner nameWorked out by the form
  • Examiner signatureSignature
  • Received for the user or owner byShort answer
  • Signature for the user or ownerSignature

See it filled in

A completed pressure system inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Pressure system inspection FAQs

When is the report due?

PSSR regulation 9 requires the competent person to send a signed, dated written report to the user (or the owner of a mobile system) as soon as practicable, to arrive within 28 days of the examination, or before the date the report sets for repairs if that is sooner.

What must the report say?

The parts examined, their condition and the results; any repairs, modifications or changes to safe operating limits with a date to complete them; the date after which the system must not be operated without another examination; and whether the scheme is suitable or should be modified.

Which systems are covered?

HSE INDG178 says relevant fluids include compressed or liquefied gas, including air, above 0.5 bar, pressurised hot water above 110°C, and steam at any pressure. Air receivers, steam boilers and autoclaves are common examples.

What if an item is unsafe?

Under PSSR regulation 10, where the competent person thinks there will be imminent danger unless repairs or changes are made, they must give the user a written report straight away and send the same details to the enforcing authority within 14 days. The system, or that part of it, must not be operated until the work is done. The form warns and counts unsafe items.

Does it replace the written scheme?

No. Under PSSR regulation 8, the user or owner must make sure the scheme has been drawn up, or certified as suitable, by a competent person. This form records each examination against it.

Who uses this?

Engineer surveyors, insurers' inspection teams, compressor and boiler service companies, and maintenance managers.

Related

Use this pressure system inspection form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →