Every item counted
The form counts the items examined, satisfactory, needing repairs and unsafe, the items running above their safe operating limit and the safety valves set differently from the written scheme.
How calculated fields work →Form library · Health and safety
An examination record for a pressure system under the Pressure Systems Safety Regulations 2000. Record the system and its written scheme of examination, then each item: scan its data plate, record the safe operating limit and the normal operating pressure, and the safety valve set pressure against the figure in the scheme. The form flags an item running above its limit or a valve set differently from the scheme, counts items satisfactory, needing repairs and unsafe, and shows the days from examination to report against the 28 days in regulation 9. It records the competent person's examination; it is not the written scheme. Try the form below, see every question or open a completed example.
Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.
Try it on your phone
Try it on this phone
Fill in the pressure system inspection on your phone now
See how the pressure system inspection looks on your phone
Scan the code with your phone camera. It opens the real form, no sign-up needed.
Open the live example and fill it in, just as your team would on site. No sign-up needed.
See it on this phoneEvery question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.
Under the Pressure Systems Safety Regulations 2000, a written scheme of examination identifies the items in a pressure system, the parts to examine, the nature of each examination including tests of protective devices, the preparation needed, the maximum interval between examinations, and the competent person who certified it. A competent person then examines the system in line with the scheme and reports.
Last updated . Facts checked by the SiteSurvey team on 17 October 2026 against regulation 8 of the Pressure Systems Safety Regulations 2000 (written scheme of examination), regulation 9 of the Pressure Systems Safety Regulations 2000, regulation 10 of PSSR 2000 (action in case of imminent danger) and HSE INDG178: written schemes of examination.
Examine each item against the written scheme with the form on a phone. Record the safe operating limit and the normal operating pressure, and the safety valve set pressure against the figure in the scheme. The form flags an item above its limit or a valve set differently, counts the items satisfactory, needing repairs and unsafe, and shows the days to the report against the 28 days in PSSR regulation 9. It records the competent person's examination; it is not the written scheme.

The form counts the items examined, satisfactory, needing repairs and unsafe, the items running above their safe operating limit and the safety valves set differently from the written scheme.
How calculated fields work →
Enter the pressure the valve lifted at and the set pressure in the written scheme, and the form shows whether they match. A valve set above the scheme stands out before the report is written.
How calculated fields work →
Each item shows its normal operating pressure against its safe operating limit, with a red note when it runs above it.
How calculated fields work →
The form shows the days from the examination to the report, and an amber note past the 28 days in regulation 9.
How calculated fields work →A fictional engineering works' compressed air system: the main receiver needs a new auto drain, the pipework is satisfactory, and the paint shop receiver's safety valve lifted at 9.0 bar against 8.0 bar in the scheme, so the receiver was locked off as unsafe. Report written 4 days after the examination. Open it as a filled-in form, or switch to a blank copy and try it yourself.


Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.
This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.
Want to see one filled in? See a completed pressure system inspection report (PDF), made by SiteSurvey from a fictional site visit.
A pressure system examination record under PSSR: the written scheme, each item with its safe operating limit, protective devices, condition, repairs and dates, the next examination and the competent person's report. 3 sections and 52 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.
This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.
Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.
For example Compressor house or Boiler room
Optional. Scan the label or tag to capture its numbers.
As found on the gauge in normal running, or from the user's records.
A completed pressure system inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.
PSSR regulation 9 requires the competent person to send a signed, dated written report to the user (or the owner of a mobile system) as soon as practicable, to arrive within 28 days of the examination, or before the date the report sets for repairs if that is sooner.
The parts examined, their condition and the results; any repairs, modifications or changes to safe operating limits with a date to complete them; the date after which the system must not be operated without another examination; and whether the scheme is suitable or should be modified.
HSE INDG178 says relevant fluids include compressed or liquefied gas, including air, above 0.5 bar, pressurised hot water above 110°C, and steam at any pressure. Air receivers, steam boilers and autoclaves are common examples.
Under PSSR regulation 10, where the competent person thinks there will be imminent danger unless repairs or changes are made, they must give the user a written report straight away and send the same details to the enforcing authority within 14 days. The system, or that part of it, must not be operated until the work is done. The form warns and counts unsafe items.
No. Under PSSR regulation 8, the user or owner must make sure the scheme has been drawn up, or certified as suitable, by a competent person. This form records each examination against it.
Engineer surveyors, insurers' inspection teams, compressor and boiler service companies, and maintenance managers.
Related templates
A compressed-air maintenance record with compressor and receiver details, isolation, visible checks, operating readings, service work and handback.
A gas boiler service record with appliance identity, engineer scope, manufacturer checks, measured results, defects, remedial work and customer handover.
A LOLER thorough examination record: each item of lifting equipment with its identity, SWL, the basis of the examination, defects, whether they are dangerous, the next examination date and the examiner's declaration.
Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.
Start your trial →