For people inspecting masonry against approved details. Pin the wall, record the details, materials and hold point, then the six workmanship checks, which the form tallies with a note to keep the hold point open when anything needs action. Add each measured observation with its limit, such as tie spacing measured from a photo against the brick courses, and the form says whether it is within the criterion. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the masonry installation inspection on your phone now

See how the masonry installation inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

What should masonry inspection compare?

Approved Documents provide Building Regulations guidance for England. Record checks against the approved structural and construction details, with temporary stability managed under the project arrangements.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against GOV.UK Approved Documents for England and HSE temporary works.

Built for inspecting masonry before it is concealed

Check each lift against the approved details before the next one goes on. Pin the wall, record the workmanship checks and the form counts the ones needing action, and add measured observations with the limit from the criterion so the form says whether each is within it. A tie spacing can be measured from a photo against the brick courses. It records construction quality observations, not design approval.

Measured value filled in as 430 mm, with the measuring photo of the wall ties against the brick courses as a thumbnail

Tie spacing from a photo

Photograph the reveal square on and measure the gap between ties against the brick courses, about 75 mm a course with its joint, then check it with a tape. It works on web forms in any phone browser today, and the app version is on its way.

How measuring from a photo works →
Limit from the criterion of 225 mm set as a maximum, with the result worked out as Outside

Measured against the limit

Enter the limit from the drawing or tolerance sheet and say whether it is a maximum or a minimum. The form says whether the measured value is within it and counts the observations outside.

How calculated fields work →
Counts worked out as 5 checks acceptable, 1 action needed and 0 not checked, with an amber note to keep the hold point open

Checks tallied with a hold note

The six workmanship checks are tallied as acceptable, action needed or not checked. When anything needs action, an amber note says to keep the hold point open until the fix is seen.

How calculated fields work →

Pin the wall

Mark current location at the wall so the plot and elevation are found again on a big site. Mark current location works on web forms in any phone browser today, and the app version is on its way.

How GPS location works →

A completed masonry installation inspection

Fictional plots on a housing site: the rear wall of plot 8 checked against the house type details, ties at the kitchen window reveal measured at about 430 mm apart against a 225 mm maximum, extra ties added and seen before the cavity was closed. Open it as a filled-in form, or switch to a blank copy and try it yourself.

A part-built cavity wall with stainless steel ties across the cavity at a reveal, marked up to give about 430 mm between ties against five brick courses
Ties at the reveal · about 430 mm apart
A new lift of buff facing brickwork with a spirit level on top and mortar tubs beside it
Ground floor lift before the hold point
Brick and block cavity wall at a window reveal with a cavity tray and wall ties
Cavity tray and ties at the window head

Try the masonry installation inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Masonry Installation InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed masonry installation inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the masonry installation inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Masonry Installation Inspection form in the SiteSurvey app on a tablet
The Masonry Installation Inspection form in the SiteSurvey app on a phone

Every question in the masonry installation inspection template

A masonry installation record linking approved details, materials, setting out, ties, cavity observations, concealed work, defects and inspection hold points. 5 sections and 55 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis records construction quality observations, not structural design approval, a wall-load assessment, temporary support design or a guarantee of concealed workmanship.
  • CheckApproved Documents provide Building Regulations guidance for England. Record checks against the approved structural and construction details, with temporary stability managed under the project arrangements. Sources: Approved Document A (structure) and Approved Document C (site preparation and resistance to contaminants and moisture); BS EN 1996 (Eurocode 6, design of masonry structures) with its UK guidance PD 6697; and, on NHBC-registered homes, NHBC Standards chapter 6.1 (external masonry walls).
  • Weather on siteAnswer

    Note frost, rain on fresh work or high wind in What you saw on site.

Wall and design

  • Wall, elevation and location ID*Short answer
  • Wall locationShort answer

    Mark it at the wall, so the plot and elevation can be found again. Tap Mark current location on site. It saves the coordinates, a grid reference and the accuracy.

  • Approved details and revision*Short answer
  • Units, mortar and component specification*Short answer
  • Lift/stage and hold point*Short answer

Workmanship checks

  • Setting out and dimensions checked against design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Units and mortar records match specification*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Bond, joints and visible workmanship checked*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Ties, restraints and reinforcement evidenced before concealment*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Cavity, trays, DPC and weep details checked where specified*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Openings, lintels and movement joints checked against details*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Concealed-work photographsPhotos
  • Checks acceptableWorked out by the form
  • Action neededWorked out by the form
  • Not checkedWorked out by the form
  • CheckAt least one check needs action. Record the action and the evidence it was put right, and keep the hold point open until it is seen, especially where the work will be concealed by the next lift.
    Shown only when the answers above make it relevant

Measured evidence and release

Record the location, measurement, units and specified criterion. Link evidence to the drawing revision used for the check.

  • Dimensional observation
    Repeat for each dimensional observation. Each one asks:
    • Measurement point and parameter*Short answer
    • Actual result and unit*Short answer
    • Measured value (mm)Number

      Optional. For example tie spacing, cavity width or out of plumb. Use a tape or level, or measure a spacing from a square-on photo with brick courses as the reference (a course of brick with its joint is usually 75 mm). Measuring from a photo gives an estimate. The tool rounds to 10 mm.

    • Limit from the criterion (mm)Number
    • The limit isChoose one
      • A maximum
      • A minimum
      Shown when “Limit from the criterion (mm)” is answered
    • Measured against the limitWorked out by the form
      Shown when “Measured value (mm)” is answered and “Limit from the criterion (mm)” is answered
    • Acceptance criterion and source*Short answer
    • Instrument and calibration referenceShort answer
    • Comparison*Choose one
      • Within criterion
      • Outside criterion
      • Unable to assess
    • Exception and response*Notes
      Shown only when the answers above make it relevant
  • Observations recordedWorked out by the form
  • Outside the criterionWorked out by the form
  • Measured values outside the limitWorked out by the form
  • Temporary stability concerns and referralNotes
  • Defects and reinspectionNotes
  • Hold-point release referenceShort answer

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidenceNotes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This records construction quality observations, not structural design approval, a wall-load assessment, temporary support design or a guarantee of concealed workmanship.

What a useful entry looks like

Dimensional observation

Record the location, measurement, units and specified criterion. Link evidence to the drawing revision used for the check.

Measurement at wall M-03 linked to detail D-12 revision A. Photograph and instrument reference retained with the actual recorded value.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed masonry installation inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Masonry Installation Inspection FAQs

How should I record “Dimensional observation”?

Record the location, measurement, units and specified criterion. Link evidence to the drawing revision used for the check.

Does this give a standard tie spacing?

No. Record the approved design and actual evidence for the wall system.

Can photographs prove concealed compliance?

They support review but cannot establish matters outside the recorded view and inspection scope.

What if the wall appears unstable?

Record the concern and refer immediately through site safety and temporary works arrangements.

What are the limits of this template?

This records construction quality observations, not structural design approval, a wall-load assessment, temporary support design or a guarantee of concealed workmanship.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.