Skip to main content

Form library · Facilities and maintenance

Lift maintenance checklist

For lift engineers recording a maintenance visit. Measure the step at each landing and the form checks it against the tolerance in your procedure, counts the checks and the defects by priority, and flags a thorough examination more than 6 months old. It records the visit and does not replace the thorough examination. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the lift maintenance visit on your phone now

See how the lift maintenance visit looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

Is lift servicing the same as thorough examination?

HSE distinguishes lift maintenance from thorough examination by a competent person. Servicing does not replace the applicable examination arrangements, and significant changes or exceptional circumstances can require further examination.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE lifting equipment questions and examinations and HSE lifting equipment at work.

Built for recording a lift maintenance visit

Fill the visit in at the lift on a phone. Measure the step at each landing and the form checks it against the tolerance in your maintenance procedure, counts the checks and the defects by priority, and flags a thorough examination more than 6 months old. It records the maintenance visit; it is not a thorough examination report.

Floor 2 as found with a step between the sills of 14 mm, worked out as Outside the tolerance

Stopping accuracy at every landing

Stop the car at each landing and measure the step between the car sill and the landing sill with a rule. The form compares each one with the tolerance from your maintenance procedure, so a trip step is caught and recorded.

How calculated fields work →
Counts worked out as 5 landings checked, 1 outside the tolerance and a largest step of 14 mm, with an amber note about the trip hazard

Landings counted

The form counts the landings checked and those outside the tolerance and shows the largest step, with a note to record the adjustment or the restriction.

How calculated fields work →
Counts worked out as 3 defects found: 0 urgent, 2 soon, 1 routine and 1 still open

Defects by priority

Log each defect with where it is, a photo and a priority. The form counts them by priority and shows how many are still open. An open urgent defect shows a red note to record how the lift was left.

How calculated fields work →

A completed lift maintenance visit

A monthly visit to a fictional housing association block: the car stopped 14 mm high at floor 2 against a 10 mm tolerance and was adjusted, worn landing door gibs were replaced, and a cracked car top light diffuser is booked for the next visit. Open it as a filled-in form, or switch to a blank copy and try it yourself.

A steel rule standing on a lift landing sill against the car sill, showing the step between them
Floor 2 as found · 14 mm high · adjusted to 4 mm
The bottom of a lift landing door and its sill track, where the door gibs run
Floor 2 landing door gibs · replaced
An open lift controller cabinet beside the lift doors at the top landing, with a locked-off isolator below
Controller isolated and locked off for the visit
Up to the lift and down to the sills

Try the lift maintenance visit form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Lift Maintenance VisitOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed lift maintenance visit report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the lift maintenance visit on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Lift Maintenance Visit form in the SiteSurvey app on a tablet
The Lift Maintenance Visit form in the SiteSurvey app on a phone

Every question in the lift maintenance visit template

A lift maintenance visit record with asset details, service scope, manufacturer checks, fault findings, examination references and handback restrictions. 6 sections and 71 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer
  • Manufacturer, model and serial number: the product's model

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckFor competent lift maintainers. This is not a LOLER examination report, rescue authorisation or proof that a lift may be returned to service.
  • CheckHSE distinguishes lift maintenance from thorough examination by a competent person. Servicing does not replace the applicable examination arrangements, and significant changes or exceptional circumstances can require further examination. Sources: The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), regulation 9, require lifts carrying people to be thoroughly examined by a competent person at least every 6 months or to a written scheme of examination. BS 7255:2012 is the code of practice for safe working on lifts. BS EN 13015 sets the rules for the maintenance instructions the lift maker must supply.

Equipment and work

  • Lift asset ID and location*Short answer
  • Manufacturer, model and serial number*Short answer
    Fills in from the product's model
  • Maintenance procedure and revision*Short answer
  • Technician and competence reference*Short answer
  • Planned work and exclusions*Notes
  • Safe isolation or permit reference*Short answer

Service information

  • Lift type, rated capacity and served floors*Short answer
  • Latest thorough examination reference and outstanding mattersShort answer
  • Date of the latest thorough examinationDate
  • Days since that examinationWorked out by the form
    Shown when “Date of the latest thorough examination” is answered and “Record date” is answered
  • CheckMore than 6 months since the last thorough examination. Lifts carrying people are usually examined at least every 6 months, unless an examination scheme sets other intervals. Check the arrangements with the duty holder. This record does not replace the examination.
    Shown only when the answers above make it relevant
  • Fault codes and user reportsShort answer
  • Rescue arrangements and responsible contactShort answer

Maintenance evidence

  • Landing and car doors checked to approved procedure*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Accessible suspension or drive components checked*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Levelling and controls checked by the competent maintainer*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Alarm and communication arrangements checked*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Required guards and access controls restored*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Checks acceptableWorked out by the form
  • Checks needing actionWorked out by the form
  • Checks not doneWorked out by the form
  • Stopping tolerance from the maintenance procedure (± mm)Number

    From the maker's maintenance instructions or the contract. The form compares each landing with it; it does not set the figure.

  • Stopping accuracy at each landing
    Repeat for each landing. Each one asks:
    • Landing*Short answer
    • Step between the sills (mm)Number
    • Size of the step (mm)Worked out by the form
    • Against the toleranceWorked out by the form
      Shown only when the answers above make it relevant
  • Landings checkedWorked out by the form
  • Landings outside the toleranceWorked out by the form
  • Largest step (mm)Worked out by the form
    Shown only when the answers above make it relevant
  • CheckAt least one landing is outside the tolerance. A step at the sill is a trip hazard. Record the adjustment made, or the restriction and who was told, below.
    Shown only when the answers above make it relevant
  • Specialist tests performed and separate reportsNotes

    Reference specialist test or examination reports separately from routine service observations. Identify any work not covered by this visit.

  • Defects found
    Repeat for each defect. Each one asks:
    • Where on the equipment*Short answer
    • Defect*Notes
    • Priority*Choose one
      • Urgent: make safe or restrict use now
      • Soon: before the next visit
      • Routine: at the next planned visit
    • Put right on this visit?Yes or No
    • What happens next, and whoNotes
      Shown when “Put right on this visit?” is No
    • Photos of the defectPhotos
  • Defects foundWorked out by the form
  • UrgentWorked out by the form
  • SoonWorked out by the form
  • RoutineWorked out by the form
  • Defects still openWorked out by the form
  • WarningAn urgent defect is still open. Record below how the equipment was left (restricted or out of service) and who on site was told before you leave.
    Shown only when the answers above make it relevant

Work and handback

  • Work performed and parts usedNotes
  • Post-work tests and evidenceNotes
  • Equipment handback*Choose one
    • Available within recorded limits
    • Restricted use
    • Out of service
  • Restrictions, isolation and person informed*Notes
    Shown only when the answers above make it relevant
  • Condition and work evidence photosPhotos
  • Next service dueDate

    Set by the maintenance contract and the maker's maintenance instructions.

  • Days to the next serviceWorked out by the form
    Shown when “Record date” is answered and “Next service due” is answered
  • CheckThe next service date is before the record date. Check the date.
    Shown only when the answers above make it relevant
  • Site contact told of the handbackShort answer
  • Site contact signatureSignature

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

For competent lift maintainers. This is not a LOLER examination report, rescue authorisation or proof that a lift may be returned to service.

What a useful entry looks like

Specialist tests performed and separate reports

Reference specialist test or examination reports separately from routine service observations. Identify any work not covered by this visit.

Specialist report LM-06 is attached by reference. The visit record covers the listed maintenance tasks and does not replace that report's findings.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed lift maintenance visit report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Lift Maintenance Visit FAQs

How should I record “Specialist tests performed and separate reports”?

Reference specialist test or examination reports separately from routine service observations. Identify any work not covered by this visit.

Does it set examination dates?

No. Record the date of the latest thorough examination and the form shows how many days ago it was, with a note when it is more than 6 months, the usual interval for lifts carrying people unless an examination scheme says otherwise. Follow the duty holder's examination scheme.

Can building staff use it to repair a lift?

It is written for competent maintainers following lift-specific procedures, not as repair instructions for building staff.

What goes in the handback?

Record tests, remaining restrictions, out-of-service controls and who received the information.

What are the limits of this template?

For competent lift maintainers. This is not a LOLER examination report, rescue authorisation or proof that a lift may be returned to service.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Use this lift maintenance visit form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →