Skip to main content

Form library · Facilities and maintenance

HVAC maintenance checklist

An HVAC and air conditioning maintenance record for planned services, call-outs and return visits. Each unit gets its own checks, refrigerant and leak check details, a temperature difference checked against the range you expect, and a GPS pin if it is on the roof. The form counts units with defects by priority and any left isolated. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the HVAC maintenance on your phone now

See how the HVAC maintenance looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

What should an HVAC maintenance checklist include?

An HVAC maintenance checklist should record the job, any permits and the engineer's F gas certificate. For each unit it covers filters, coils, the condensate drain, fans and belts, electrical connections, supply and return temperatures, the refrigerant, charge and leak check, gas added or recovered, defects and how the unit was left. It ends with the F gas records, parts used, the next service date and signatures.

Last updated . Facts checked by the SiteSurvey team on 5 October 2026 against article 4 (leak checks) of Regulation (EU) No 517/2014 as retained in GB law, article 6 (record keeping) of Regulation (EU) No 517/2014 as retained in GB law, GOV.UK on checking F gas equipment for leaks, GOV.UK on recording F gas in equipment you own or service, GOV.UK on qualifications to work on equipment containing F gas, GOV.UK on certification for companies working on F gas equipment, GOV.UK on moving F gas between Great Britain and Northern Ireland, regulation 18 of the Energy Performance of Buildings (England and Wales) Regulations 2012 and regulation 3 of the Notification of Cooling Towers and Evaporative Condensers Regulations 1992.

Built for servicing air conditioning and ventilation

Work through each unit on a phone. The form works out the temperature difference and checks it against the range you expect for that unit, pins units on the roof, and counts units with defects by priority and units left isolated. F gas and leak check records stay as they were.

A fan coil unit with supply 19 °C and return 23 °C, a difference of 4 °C against an expected range of 8 to 14 °C, worked out as Below the expected range

Temperature difference against the expected range

Enter the supply and return temperatures and the range from the commissioning record or the maker. The form works out the difference and says whether it is below, within or above the range, so a weak unit stands out.

How calculated fields work →
Is this unit on the roof or outside answered Yes, and the unit position filled in as a GPS point with View on map

Pin roof units

For each unit outside or on the roof, tap Mark current location beside it. On a busy roof the next engineer finds the right one. Mark current location works on web forms in any phone browser today, and the app version is on its way.

How GPS location works →
Counts worked out as 4 units serviced, 0 with a leak to repair, 1 outside the expected temperature difference, 0 urgent, 2 soon, 0 routine and 0 left isolated

Units counted

The form totals the units, those outside the expected difference, the defects by priority and any unit left isolated. An urgent defect or an isolated unit shows a red note before sign-off.

How calculated fields work →

Walk the roof with Walk Cam

Record a short clip at each unit and say what you did. The note is written down for you and kept with the visit.

How Walk Cam works →

A completed HVAC maintenance visit

A six-monthly service at a fictional office: a VRF system and an AHU on the roof, both pinned, a comms room wall unit with a failing condensate pump, and a fan coil only 4 °C below the room because its valve actuator sticks. Open it as a filled-in form, or switch to a blank copy and try it yourself.

VRF outdoor units on a gravel roof
VRF-OU-01 · ΔT 11 °C · within 8 to 14 °C
A wall mounted air conditioning unit above a comms cabinet with water streaks on the wall below it
AC-04 · condensate pump failing · soon
An air handling unit on a roof with its filter section open
AHU-01 · filters replaced

Try the HVAC maintenance form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: HVAC and Air Conditioning MaintenanceOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed HVAC maintenance report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the hvac and air conditioning maintenance on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The HVAC and Air Conditioning Maintenance form in the SiteSurvey app on a tablet
The HVAC and Air Conditioning Maintenance form in the SiteSurvey app on a phone

Every question in the HVAC maintenance template

Service visit record for air conditioning, heat pumps, ventilation and air handling units. Unit by unit checks, refrigerant and F gas leak checks, parts used and sign-off. 6 sections and 99 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Customer: the project's customer
  • Site: the site, when the form is opened for a space or a product
  • Address: the site address, from the space or the project

Job details

The job, the site and the main system.

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Job or work order referenceShort answer
  • CustomerShort answer
    Fills in from the project's customer
  • Site*Short answer
    Fills in from the site, when the form is opened for a space or a product
  • AddressShort answer
    Fills in from the site address, from the space or the project
  • Date of visit*Date
  • Type of visit*Choose one
    • Planned service
    • Reactive call-out
    • Return visit for a defect
  • Which planned service is this?Choose one
    • Monthly
    • Quarterly
    • Six monthly
    • Annual
    Shown when “Type of visit” is “Planned service”
  • What was reported, and by whom?Notes
    Shown when “Type of visit” is “Reactive call-out”
  • Reference of the earlier jobShort answer
    Shown when “Type of visit” is “Return visit for a defect”
  • Date of the last air conditioning energy inspection (TM44), if the system is over 12 kWDate
  • Days since the last energy inspectionWorked out by the form
    Shown when “Date of the last air conditioning energy inspection (TM44), if the system is over 12 kW” is answered and “Date of visit” is answered
  • CheckEnergy inspection may be overdue. The Energy Performance of Buildings (England and Wales) Regulations 2012 require air conditioning systems with an effective rated output over 12 kW to have an energy inspection by an accredited assessor at intervals of no more than 5 years. CIBSE TM44 is the method used. Tell the customer.
    Shown only when the answers above make it relevant
  • Engineer nameShort answer
  • Does any of the work need a permit from the site?Yes or No
  • Which permits?Tick all that apply
    • Roof access
    • Electrical isolation
    • Hot work
    • Confined space
    • Other (describe)
    Shown when “Does any of the work need a permit from the site?” is Yes
  • Permit referencesShort answer
    Shown when “Does any of the work need a permit from the site?” is Yes

F gas competence and site

Certificates for the work, and where the site is.

  • Where is the site?Choose one
    • England, Scotland or Wales
    • Northern Ireland
  • GuidanceGreat Britain. The F gas notes in this form follow the rules as they apply in Great Britain: Regulation (EU) No 517/2014 as retained in GB law, with the Fluorinated Greenhouse Gases Regulations 2015.
    Shown when “Where is the site?” is “England, Scotland or Wales”
  • CheckNorthern Ireland. Northern Ireland is part of the EU F gas system, so the Great Britain notes in this form may not match the rules there. Check the current EU requirements for this site.
    Shown when “Where is the site?” is “Northern Ireland”
  • Does the engineer hold a personal F gas certificate for stationary refrigeration, air conditioning and heat pumps?*Yes or No
  • Certificate categoryChoose one
    • Category 1
    • Category 2
    • Category 3
    • Category 4
    Shown when “Does the engineer hold a personal F gas certificate for stationary refrigeration, air conditioning and heat pumps?” is Yes
  • Certificate numberShort answer
    Shown when “Does the engineer hold a personal F gas certificate for stationary refrigeration, air conditioning and heat pumps?” is Yes
  • GuidanceWhat each category covers. Category 1 covers all activities. Category 2 covers installing, maintaining, servicing and recovering refrigerant on systems with less than 3kg of F gas, or less than 6kg if hermetically sealed. Category 3 covers recovery only on those smaller systems. Category 4 covers leak checks that do not break into the refrigeration circuit.
    Shown when “Does the engineer hold a personal F gas certificate for stationary refrigeration, air conditioning and heat pumps?” is Yes
  • WarningNo F gas certificate. It is against the law to work on equipment containing F gas without the correct qualification. Do not check for leaks, recover gas or work on the refrigerant circuit. Record the non refrigerant checks only and book a certified engineer.
    Shown when “Does the engineer hold a personal F gas certificate for stationary refrigeration, air conditioning and heat pumps?” is No
  • Is the company certified to work on F gas equipment for others?Yes or No
  • Certification bodyChoose one
    • Refcom
    • F-Gas Register (Quidos)
    • Bureau Veritas
    • Other (describe)
    Shown when “Is the company certified to work on F gas equipment for others?” is Yes
  • Company certificate numberShort answer
    Shown when “Is the company certified to work on F gas equipment for others?” is Yes
  • CheckA company, including a sole trader, that installs, repairs, maintains or decommissions stationary air conditioning, refrigeration or heat pump equipment operated by others must be certified by an approved body. A company servicing only its own equipment does not need company certification.
    Shown when “Is the company certified to work on F gas equipment for others?” is No
  • Is there a cooling tower or evaporative condenser on this site?Yes or No
  • CheckCooling towers and evaporative condensers. The Notification of Cooling Towers and Evaporative Condensers Regulations 1992 require the person in control of the premises to notify the local authority in writing of these devices. HSE guidance is that they need measures to prevent or control the risk of legionella (see HSE L8). This form does not cover that work.
    Shown when “Is there a cooling tower or evaporative condenser on this site?” is Yes
  • Has the client told you the devices are notified to the local authority?Yes or No
    Shown when “Is there a cooling tower or evaporative condenser on this site?” is Yes

Unit by unit record

One entry for each unit. Checks, temperatures, refrigerant and leak check.

  • GuidanceWhat a good photo shows. Stand back to show the whole unit and its rating label, so the refrigerant and charge can be read. Then photograph any defect close up.
  • Units by plant room or area
    Repeat for each entry. Each one asks:
    • Plant room, floor or area*Short answer

      For example Roof plant area or Second floor

    • Units in this area
      Repeat for each unit. Each one asks:
      • Type of unit*Choose one
        • Split or multi-split air conditioning
        • VRF or VRV system
        • Packaged unit
        • Air handling unit
        • Fan coil unit
        • Heat pump
        • Mechanical ventilation or MVHR
        • Chiller
      • Unit or asset referenceShort answer
      • Position in this areaShort answer
      • Is this unit on the roof or outside?Yes or No
      • Where is the unit?Short answer

        Mark it standing beside the unit, so the next engineer finds the right one on a busy roof. Tap Mark current location at the unit. It saves the coordinates, a grid reference and the accuracy.

        Shown when “Is this unit on the roof or outside?” is Yes
      • ManufacturerShort answer
      • ModelShort answer
      • Serial numberShort answer
      • Photos before the workPhotos
      • FiltersChoose one
        • Cleaned
        • Replaced
        • Checked, no action needed
        • No access
      • CoilsChoose one
        • Clean
        • Cleaned on this visit
        • Dirty, needs a deeper clean
        • Damaged
      • Condensate drain and pumpChoose one
        • Clear
        • Cleared on this visit
        • Blocked or leaking
        • Not applicable
      • CheckCondensate problem. A blocked drain or failed pump can overflow onto ceilings and electrics.
        Shown when “Condensate drain and pump” is “Blocked or leaking”
      • Fans and beltsChoose one
        • Satisfactory
        • Adjusted
        • Belt replaced
        • Defect found
        • Not applicable
      • Electrical connections and controlsChoose one
        • Satisfactory
        • Connections tightened
        • Defect found
      • Supply air or flow temperature (°C)Number
      • Return air or return temperature (°C)Number
      • Temperature difference, return minus supply (°C)Worked out by the form
        Shown when “Supply air or flow temperature (°C)” is answered and “Return air or return temperature (°C)” is answered
      • Expected difference, lowest (°C)Number

        From the commissioning record or the maker's data for this mode. The form compares the reading with it; it sets no figure.

      • Expected difference, highest (°C)Number
      • Difference against the expected rangeWorked out by the form
        Shown when “Supply air or flow temperature (°C)” is answered and “Return air or return temperature (°C)” is answered and “Expected difference, lowest (°C)” is answered and “Expected difference, highest (°C)” is answered
      • Does this unit hold F gas refrigerant?Yes or No
      • Refrigerant, from the labelShort answer
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Charge (kg)Number
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Global warming potential of the gasNumber

        From the label or the data sheet.

        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Carbon dioxide equivalent (tonnes)Worked out by the form
        Shown only when the answers above make it relevant
      • Is the unit labelled as hermetically sealed?Yes or No
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Is a leak detection system fitted?Yes or No
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • GuidanceUnder 5 tonnes. The F gas rules do not require leak checks for this unit.
        Shown only when the answers above make it relevant
      • GuidanceHermetically sealed and under 10 tonnes. The F gas rules do not require leak checks for this unit, as long as it is labelled as hermetically sealed.
        Shown only when the answers above make it relevant
      • Check5 tonnes or more, under 50. Leak checks are due at least once every 12 months, or every 24 months where a leak detection system is fitted.
        Shown only when the answers above make it relevant
      • Check50 tonnes or more, under 500. Leak checks are due at least once every 6 months, or every 12 months where a leak detection system is fitted.
        Shown only when the answers above make it relevant
      • Warning500 tonnes or more. Leak checks are due at least once every 3 months, or every 6 months with a leak detection system. Equipment of this size must have a leak detection system that alerts the operator or a service company.
        Shown only when the answers above make it relevant
      • Date of the previous leak check, from the F gas recordDate
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Days since the previous leak checkWorked out by the form
        Shown when “Does this unit hold F gas refrigerant?” is Yes and “Date of the previous leak check, from the F gas record” is answered and “Date of visit” is answered
      • Was a leak check done on this visit?Yes or No
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Leak check methodChoose one
        • Direct: electronic detector or bubble solution
        • Indirect: system parameters
        • Leak detection system
        Shown when “Does this unit hold F gas refrigerant?” is Yes and “Was a leak check done on this visit?” is Yes
      • Result of the leak checkChoose one
        • No leak found
        • Leak found and repaired
        • Leak found, repair still needed
        Shown when “Does this unit hold F gas refrigerant?” is Yes and “Was a leak check done on this visit?” is Yes
      • Where was the leak?Short answer
        Shown only when the answers above make it relevant
      • WarningLeak found. The operator must have the leak repaired without undue delay. Where the unit is subject to leak checks, a certified person must check it within one month of the repair to confirm the repair worked.
        Shown only when the answers above make it relevant
      • Refrigerant added (kg)Number
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Refrigerant recovered (kg)Number
        Shown when “Does this unit hold F gas refrigerant?” is Yes
      • Photos after the workPhotos
      • Any defects on this unit?Yes or No
      • Describe the defectNotes
        Shown when “Any defects on this unit?” is Yes
      • PriorityChoose one
        • Routine, at the next service
        • Soon, before the next service
        • Urgent
        Shown when “Any defects on this unit?” is Yes
      • How was the unit left?Choose one
        • Running normally
        • Running with a defect
        • Isolated and labelled out of use
    • This plant room or area: units servicedWorked out by the form
    • This plant room or area: units with a leak still to repairWorked out by the form
    • This plant room or area: units outside the expected temperature differenceWorked out by the form
    • This plant room or area: urgent defectsWorked out by the form
    • This plant room or area: soonWorked out by the form
    • This plant room or area: routineWorked out by the form
    • This plant room or area: units left isolatedWorked out by the form
  • Units servicedWorked out by the form
  • Units with a leak still to repairWorked out by the form
  • Units outside the expected temperature differenceWorked out by the form
  • Urgent defectsWorked out by the form
  • SoonWorked out by the form
  • RoutineWorked out by the form
  • Units left isolatedWorked out by the form
  • WarningAn urgent defect or an isolated unit. Make sure the customer knows before you leave, and record who was told on the sign-off page.
    Shown only when the answers above make it relevant

F gas records

What has been recorded for the operator.

  • Have the F gas records been updated for every unit that needs them?Yes or No
  • Who holds the F gas records for this site?Short answer
  • GuidanceF gas records. For equipment that needs leak checks, the operator must keep records of the type and quantity of gas installed and added, the gas recovered, who installed or serviced it, and the dates and results of the leak checks, for at least 5 years. A company doing the work for an operator keeps copies for 5 years too.
  • CheckThe records have not been updated. Give the client the refrigerant, charge, leak check result and any gas added or recovered from this form so they can add them.
    Shown when “Have the F gas records been updated for every unit that needs them?” is No

Outcome and parts

How the visit ended and what was used.

  • Outcome of the visit*Choose one
    • All units serviced and working
    • Serviced, defects to follow up
    • Not completed
  • What needs doing next, and why?Notes
    Shown only when the answers above make it relevant
  • WarningAt least one unit has a leak still to repair. Make sure the client knows and a repair visit is booked.
    Shown only when the answers above make it relevant
  • RecommendationsNotes
  • Did you use any parts or materials?Yes or No
  • Parts and materials used
    Repeat for each part. Each one asks:
    Shown when “Did you use any parts or materials?” is Yes
    • ItemShort answer
    • Part numberShort answer
    • QuantityNumber
  • Next service dueDate
  • Days until the next serviceWorked out by the form
    Shown when “Next service due” is answered and “Date of visit” is answered

Sign-off

The customer signs for the visit. The engineer signs for the work.

  • Is the customer or their representative available to sign?Yes or No
  • Why not, and who will you send the report to?Short answer
    Shown when “Is the customer or their representative available to sign?” is No
  • Customer nameShort answer
    Shown when “Is the customer or their representative available to sign?” is Yes
  • PositionShort answer
    Shown when “Is the customer or their representative available to sign?” is Yes
  • Customer commentNotes
    Shown when “Is the customer or their representative available to sign?” is Yes
  • Customer signatureSignature
    Shown when “Is the customer or their representative available to sign?” is Yes
  • Engineer nameWorked out by the form
  • Engineer signatureSignature

See it filled in

A completed HVAC maintenance report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

HVAC maintenance FAQs

How often does air conditioning need an F gas leak check?

It depends on the charge in tonnes of carbon dioxide equivalent, which the form works out from the charge and the global warming potential on the label. Under 5 tonnes, no leak checks are required, nor for a unit labelled hermetically sealed under 10 tonnes. From 5 to under 50 tonnes it is every 12 months, from 50 to under 500 every 6 months, and 500 tonnes or more every 3 months, with longer intervals where a leak detection system is fitted. These notes follow the Great Britain rules, and Northern Ireland is in the EU F gas system.

What F gas records must be kept?

For equipment that needs leak checks, the operator must keep records of the type and quantity of gas installed and added, the gas recovered, who installed or serviced it, and the dates and results of the leak checks, for at least 5 years. A company doing the work for an operator keeps copies for 5 years too. The form asks whether the records have been updated and who holds them.

Which F gas certificate does an engineer need?

It is against the law to work on equipment containing F gas without the correct qualification. Category 1 covers all activities, Category 2 covers work on systems under 3kg, or 6kg if hermetically sealed, Category 3 is recovery only on those, and Category 4 is leak checks that do not break into the circuit. A company working on others' equipment must also be certified by an approved body.

What happens if a leak is found?

The operator must have the leak repaired without undue delay. Where the unit is subject to leak checks, a certified person must check it within one month of the repair to confirm the repair worked. The form records where the leak was and whether it was repaired, counts the units with a leak still to repair and prompts you to make sure a repair visit is booked.

Does it cover TM44 inspections and cooling towers?

It records the date of the last air conditioning energy inspection, often called a TM44 inspection. In England and Wales, regulation 18 of the Energy Performance of Buildings (England and Wales) Regulations 2012 requires the accessible parts of systems over 12 kW to be inspected by an energy assessor at least every 5 years. Cooling towers and evaporative condensers must be notified to the local authority in writing, but the form only asks whether that has been done and does not cover legionella control.

Can the customer sign the service record on site?

Yes. The customer gives their name, position and a comment and signs on the device, and the engineer signs for the work. If nobody is there to sign, the form records why and who gets the report. In the SiteSurvey app it works offline, with before and after photos against each unit, and the report goes out as a PDF or a share link.

Related

Use this HVAC maintenance form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →