Heat pump commissioning checklist

A commissioning record for an air or ground source heat pump. Scan the data plate, pin the outdoor unit by GPS and measure its clearance from a photo against the installation manual. Enter the rated output and the design heat loss, and the form shows the output as a share of the heat loss. Record the flush, inhibitor and pressure, then the flow and return temperatures: the form works out the difference and compares the flow and the difference with the design. Record the cylinder set point and pasteurisation, the MCS certificate, the DNO notification and the handover. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the heat pump commissioning on your phone now

See how the heat pump commissioning looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

What is checked when a heat pump is commissioned?

Heat pump commissioning checks that the system has been flushed and treated, the pressure is right, the flow temperature matches the design, the flow to return difference is as expected, weather compensation is set, emitters are balanced and hot water is stored safely. The installer then creates the MCS certificate, notifies the DNO and shows the customer how to use the controls.

Last updated . Facts checked by the SiteSurvey team on 17 October 2026 against MCS: notifying DNOs, MCS: a compliance reminder for MCS certificates (14 days after commissioning), GOV.UK: Boiler Upgrade Scheme, how to apply, HSE: hot and cold water systems, things to consider (legionella) and GOV.UK: qualifications required to work on equipment containing F gas.

Built for commissioning heat pumps

Record the commissioning at the property on a phone. Pin the outdoor unit, measure its clearance from a photo against the installation manual, and enter the rated output against the design heat loss. The form works out the flow to return difference and compares the flow temperature and the difference with the system design. The design figures come from your heat loss calculation and system design; the form sets none.

Flow to return difference 5 °C, measured flow 1 °C below the design flow, and the measured difference 0 °C from the design difference

Temperatures against the design

Enter the design flow temperature and difference from the system design, then the measured flow and return. The form works out the difference and how far the flow and the difference are from the design.

How calculated fields work →
Design heat loss 6.4 kW and the rated output worked out as 109% of the heat loss

Output against the heat loss

Enter the design heat loss from your heat loss calculation. The form shows the rated output as a share of it, with a note to check the output at the design conditions if it is lower.

How calculated fields work →
Smallest clearance around the outdoor unit measured from a photo as 0.34 m, with the marked-up photo kept under the field

Clearance around the outdoor unit

Photograph the unit square on and measure the tightest gap, using the unit width from its data sheet as the reference. The form compares it with the manual's minimum. It works on web forms in any phone browser today, and the app version is on its way.

How measuring from a photo works →
Where is the outdoor unit filled in with a GPS point in the rear garden, with Mark again and View on map

Pin the outdoor unit

Tap Mark current location beside the unit, so the service engineer finds it first time. Mark current location works on web forms in any phone browser today, and the app version is on its way.

How GPS location works →

A completed heat pump commissioning record

A fictional 7 kW monobloc at a Herefordshire cottage: rated output 109% of a 6.4 kW design heat loss, flow 44 °C against a 45 °C design with a 5 °C difference as designed, the unit about 0.34 m from the fence against a 0.3 m minimum, cylinder pasteurisation set and the DNO notified the day after commissioning. Open it as a filled-in form, or switch to a blank copy and try it yourself.

A heat pump outdoor unit beside a back door and a fence, marked up with the unit width as the reference and a measuring line from the unit to the fence
Unit to the fence · about 0.34 m · minimum 0.3 m
A new hot water cylinder in an airing cupboard with its pipework, expansion vessel and controls
Cylinder, pasteurisation cycle set
Insulated flow and return pipes entering a brick wall, each with a dial thermometer, strainer and valves
Flow 44 °C · return 39 °C
Up to the outdoor unit in the garden

Try the heat pump commissioning form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Heat Pump Commissioning RecordOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed heat pump commissioning report (PDF), made by SiteSurvey from a fictional site visit.

Every question in the heat pump commissioning template

A heat pump commissioning record: unit and refrigerant, system pressure and flushing, flow and return temperatures, weather compensation, hot water and pasteurisation, MCS certificate, DNO and handover. 5 sections and 59 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Client: the project's customer
  • Site: the site, when the form is opened for a space or a product
  • Site address: the site address, from the space or the project

Heat pump

  • ProjectShort answer
    Fills in from the project name
  • ClientShort answer
    Fills in from the project's customer
  • Site*Short answer
    Fills in from the site, when the form is opened for a space or a product
  • Site addressShort answer
    Fills in from the site address, from the space or the project
  • Date commissioned*Date
  • Time commissionedTime
  • Installer and MCS certification number*Short answer
  • Heat pump make and model*Short answer
  • Serial numberShort answer
  • Scan the data plateScan a label: serial number, model number

    Optional. Scan the label or tag to capture its numbers.

  • Where is the outdoor unit?Short answer

    Air source units. Mark it standing beside the unit. Tap Mark current location at the unit. It saves the coordinates, a grid reference and the accuracy.

  • Smallest clearance around the outdoor unit (m)Number

    Measure from a photo taken square on, using the unit width from the data sheet as the reference. It is an estimate; close to the minimum, use a tape.

  • Minimum clearance in the installation manual (m)Number
  • Clearance against the manualWorked out by the form
    Shown when “Smallest clearance around the outdoor unit (m)” is answered and “Minimum clearance in the installation manual (m)” is answered
  • Rated output (kW)Number
  • Design heat loss from the heat loss calculation (kW)Number
  • Rated output as a share of the heat loss (%)Worked out by the form
    Shown only when the answers above make it relevant
  • CheckThe rated output is below the design heat loss. Check the output at the design outdoor and flow temperatures in the manufacturer's data against the system design.
    Shown only when the answers above make it relevant
  • Refrigerant type and charge (kg)Short answer
  • Refrigerant circuitChoose one
    • Factory sealed (monobloc)
    • Split system: refrigerant work on site
  • CheckGOV.UK: anyone installing a refrigeration, air conditioning or heat pump system that contains F gas must hold an F gas qualification, and the company needs F gas certification.
    Shown when “Refrigerant circuit” is “Split system: refrigerant work on site”
  • F-gas certificate numberShort answer
    Shown when “Refrigerant circuit” is “Split system: refrigerant work on site”

Heating system

  • System flushed and cleaned before commissioning?Yes or No
  • Inhibitor or antifreeze added at the right concentration?Yes or No
  • System pressure, cold (bar)Number
  • Design flow temperature (°C)Number
  • Design flow to return difference (°C)Number

    From the system design.

  • Measured flow temperature (°C)Number
  • Measured return temperature (°C)Number
  • Flow to return difference (°C)Worked out by the form
    Shown when “Measured flow temperature (°C)” is answered and “Measured return temperature (°C)” is answered
  • Measured flow minus design flow (°C)Worked out by the form
    Shown when “Measured flow temperature (°C)” is answered and “Design flow temperature (°C)” is answered
  • Measured difference minus design difference (°C)Worked out by the form
    Shown when “Measured flow temperature (°C)” is answered and “Measured return temperature (°C)” is answered and “Design flow to return difference (°C)” is answered
  • Weather compensation set up?Yes or No
  • Heat curve or compensation settingsShort answer
  • Radiators or underfloor loops balanced?Yes or No

Hot water

  • Is there a hot water cylinder?Yes or No
  • Cylinder set point (°C)Number
    Shown when “Is there a hot water cylinder?” is Yes
  • Is a regular pasteurisation (legionella) cycle set?Yes or No
    Shown when “Is there a hot water cylinder?” is Yes
  • CheckHSE says hot water cylinders should store water at 60°C or higher to control legionella. The cylinder is set lower and no pasteurisation cycle is set.
    Shown only when the answers above make it relevant

MCS, DNO and certificates

  • CheckThis is the installer's commissioning record. It supports the MCS certificate and the MIS 3005 handover documents given to the customer. It does not replace them.
  • MCS certificate numberShort answer
  • Date the MCS certificate was createdDate
  • GuidanceMCS sets a short deadline for the MCS certificate after commissioning. MCS certificate guidance says within 14 days (30 days for installers on the redeveloped installer scheme), and MIS 3005 asks for registration within 10 working days. Check the current scheme documents for your certification.
  • WarningMore than 14 days after commissioning.
    Shown only when the answers above make it relevant
  • Boiler Upgrade Scheme voucher reference, if anyShort answer
  • GuidanceBoiler Upgrade Scheme grants go through MCS certified installers, who apply to Ofgem on the customer's behalf.
  • Maximum demand of the property after installation (A)Number

    Including the new equipment and the effect of any load management.

  • Network operator (DNO) routeChoose one
    • Connect and notify after installation
    • Applied and approved before installation
    • Not known
  • CheckMCS: every heat pump installation must be notified to the DNO. Where the property's new maximum demand is 60 A or less, connect and notify the DNO within 28 days of the installation. Between 60 A and 100 A, apply before installing.
  • WarningMaximum demand is over 60 A. MCS says to apply to the DNO before installing, not connect and notify.
    Shown only when the answers above make it relevant
  • Date the DNO was notified or approvedDate
    Shown only when the answers above make it relevant
  • Days from commissioning to notificationWorked out by the form
    Shown only when the answers above make it relevant
  • WarningMore than 28 days after commissioning.
    Shown only when the answers above make it relevant
  • WarningThe approval date is after the commissioning date. Approval is needed before installation.
    Shown only when the answers above make it relevant
  • DNO referenceShort answer
    Shown only when the answers above make it relevant
  • Electrical Installation Certificate (BS 7671) reference for the new circuitShort answer
  • Issued byShort answer
  • Installer nameWorked out by the form

Handover and sign-off

  • Photos of the outdoor unit, cylinder and controlsPhotos
  • Handed overTick all that apply
    • MCS certificate
    • Manuals and warranty
    • How to use the controls
    • Maintenance schedule
    • Heat loss calculation and system design
  • Next service dueDate

    Set by the heat pump maker's instructions and warranty terms.

  • Days to next dueWorked out by the form
    Shown when “Date commissioned” is answered and “Next service due” is answered
  • CheckThe next service due date is before the commissioning date. Check the date.
    Shown only when the answers above make it relevant
  • Actions
    Repeat for each action. Each one asks:
    • Action needed*Notes
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • OwnerShort answer
    • DueDate
    • StatusChoose one
      • Open
      • In progress
      • Completed
  • Customer nameShort answer
  • Customer signatureSignature
  • Installer signatureSignature

See it filled in

A completed heat pump commissioning report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Heat pump commissioning FAQs

When is the MCS certificate due?

MCS requires the certificate to be created no later than 14 days after the commissioning date. Boiler Upgrade Scheme grants go through MCS certified installers, who apply on the customer's behalf. The form records the certificate number, its date and the voucher reference, and warns when the certificate is more than 14 days late.

Does the DNO need to know about a heat pump?

Yes. MCS says every heat pump installation must be notified. Where the property's new maximum demand is 60 A or less, you can connect and notify the DNO within 28 days of the installation; between 60 A and 100 A, apply before installing. The form records the maximum demand and route and warns when notification is late.

What hot water temperature is safe?

HSE says hot water should be stored at 60°C or higher to kill legionella bacteria. The form records the cylinder set point and warns when it is below 60°C without a regular pasteurisation cycle.

What is the flow to return difference?

The form works out the difference between the measured flow and return temperatures, then shows how far the flow temperature and the difference are from the design figures you enter. A difference well away from the design points to the flow rate or the emitters.

What about split systems?

GOV.UK says anyone installing a heat pump system that contains F gas needs an F gas qualification, and the company needs F gas certification. The form asks for the certificate number when refrigerant work was done on site.

Who uses this?

MCS heat pump installers, heating engineers and housing providers commissioning heat pumps across their stock.