A record of what the customer was given and shown at the end of a job. Record the completion and handover dates, tick the certificates, manuals, warranties and guarantees in the pack, and list the certificates still to follow with who sends them and when. Add each system you demonstrated and photograph where the stop tap, gas valve, consumer unit and controls are. The form counts what was handed over and shown, flags a system not demonstrated and lists outstanding items with agreed dates, before the customer's rating and signature. Try the form below, see every question or open a completed example.
✎Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.
A handover pack should include the certificates for the work, such as electrical, gas, MCS, building control or window certificates, the manufacturer manuals and warranties, the workmanship guarantee, keys, and information on how to use and maintain each system. In England and Wales, where the energy efficiency requirement of Part L applies, regulation 40 of the Building Regulations 2010 requires that information no later than five days after completion.
Record the completion and handover dates, the certificates in the pack and the ones still to follow with who sends them and when, each system you demonstrated, and where the stop tap, gas valve, consumer unit and controls are, with a photo of each. Add anything still outstanding with the date agreed. The form counts what was handed over and shown, and flags a system not demonstrated or an item left open.
Completion to handover, in days
Enter the completion date and say whether the energy efficiency requirement of Part L applies. The form shows the days to the handover and a note if it is more than five days, the time regulation 40 gives for the information to reach the owner.
Some certificates arrive after the handover. Add each one with who sends it and when it is expected, and the form counts them and shows the days from the handover, so nothing is forgotten.
Add each system and say whether it was demonstrated and a guide given. The form counts them and flags a system not yet shown, then records where each control and shut-off is with a photo.
The optional Walk Cam in the SiteSurvey app films the finished work and the controls at handover, so a later query starts from the same footage.
A completed customer handover
A fictional kitchen and boiler job in Bakewell: the electrical certificate in the pack, the gas compliance certificate and warranty registration to follow, the stop tap and boiler controls photographed, the cooker hood still to demonstrate and a missing plinth agreed for the following week. Open it as a filled-in form, or switch to a blank copy and try it yourself.
Stop tap under the sink · tagged and shown to the customerBoiler and controls · demonstrated, guide leftPlinth missing under the sink run · agreed for 17 October
Try the customer handover form live
Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.
This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.
A customer handover pack record: completion and handover dates, certificates in the pack and to follow, manuals, warranties and keys, each system demonstrated, where the controls and shut-offs are, outstanding items, aftercare and the customer's signature. 4 sections and 45 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.
✎
Make it your own: every question is editable
This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.
Details you only enter once
Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.
Project: the project name
Client: the project's customer
Site: the site, when the form is opened for a space or a product
Site address: the site address, from the space or the project
1
Job
ProjectShort answer
Fills in from the project name
ClientShort answer
Fills in from the project's customer
Site*Short answer
Fills in from the site, when the form is opened for a space or a product
Site addressShort answer
Fills in from the site address, from the space or the project
Handover date*Date
TimeTime
Date the work was completedDate
Does the energy efficiency requirement of Part L apply to the work?Choose one
For example a new boiler, heat pump, windows or an extension. Ask the designer or building control if you are not sure.
Yes
No
Not sure
Days from completion to this handoverWorked out by the form
Shown when “Date the work was completed” is answered and “Handover date” is answered
CheckThis handover is more than five days after completion. Where regulation 40 applies, the information should reach the owner no later than five days after completion: record when it was first given if that was earlier.
Shown only when the answers above make it relevant
Handed over by*Short answer
Work completedNotes
GuidanceBuilding Regulations 2010, regulation 40 (England and Wales). Where requirement L1 of Part L (conservation of fuel and power) applies to the work, the person carrying it out must, no later than five days after completion, give the owner enough information about the building, its fixed building services and their maintenance requirements for it to be run using no more fuel and power than is reasonable.
2
Documents and keys
CertificatesTick all that apply
Electrical installation or minor works certificate
Gas Safe building regulations certificate
MCS certificate
Building control completion certificate
FENSA or Certass certificate
Fire door or fire stopping certificates
None for this job
Manuals and warrantiesTick all that apply
Manufacturer manuals
Product warranties
Workmanship guarantee
Insurance-backed guarantee
None for this job
Keys or fobs handed overNumber
Certificates and documents to follow
Repeat for each entry. Each one asks:
Document*Choose one
Electrical installation or minor works certificate
Building regulations compliance certificate (competent person scheme)
MCS certificate
Building control completion certificate
FENSA or Certass certificate
Product warranty registration
Insurance-backed guarantee
Operating and maintenance manual
Other (describe)
Who will send itShort answer
Expected byDate
Days from the handoverWorked out by the form
Shown when “Expected by” is answered
Documents to followWorked out by the form
Photo of the packPhotos
3
Demonstrations
Systems shown to the customer
Repeat for each system. Each one asks:
System or product*Short answer
Demonstrated?Yes or No
User guide given?Yes or No
NotesShort answer
Systems handed overWorked out by the form
DemonstratedWorked out by the form
User guide givenWorked out by the form
CheckA system has not been demonstrated. Arrange a time to show the customer, or record why it was not needed.
Shown only when the answers above make it relevant
Where the controls and shut-offs are
Repeat for each entry. Each one asks:
What it is*Choose one
Water stop tap
Gas emergency control valve
Consumer unit
Boiler or heat pump controls
Heating programmer or thermostat
Isolation switch
Water meter
Alarm panel
Other (describe)
Where it isShort answer
Shown to the customer?Yes or No
PhotoPhotos
Controls and shut-offs shownWorked out by the form
Maintenance the customer needs to arrange, and whenNotes
Aftercare contactShort answer
4
Sign-off
Outstanding items agreed at handover
Repeat for each item. Each one asks:
What is outstanding*Notes
Agreed completion dateDate
PhotoPhotos
Outstanding itemsWorked out by the form
CheckItems are outstanding. Give the customer the agreed dates and close each one with a return visit record.
Shown only when the answers above make it relevant
Customer satisfactionChoose one
Very satisfied
Satisfied
Not satisfied
Customer commentsNotes
Happy to leave a review?Yes or No
Customer nameShort answer
Customer signatureSignature
Installer nameWorked out by the form
Installer signatureSignature
See it filled in
A completed customer handover report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.
Where requirement L1 of Part L applies to the work, the person carrying it out must, no later than five days after completion, give the owner enough information about the building, its fixed building services and their maintenance requirements for it to be run using no more fuel and power than is reasonable. The form shows this at the start.
Why record demonstrations?
Showing the customer how to use a boiler, heat pump, alarm or appliance prevents call-backs, and the record shows it was done. Add each system with whether it was demonstrated and a guide given.
When do the certificates arrive?
Some come after the handover. GOV.UK says an installer registered with a competent person scheme gives a compliance certificate within 8 weeks of completion, and MCS requires the MCS certificate to be created within 14 days of commissioning. Tick what is in the pack on the day and add each certificate still to follow, with who sends it and the expected date, so the form counts them.
Is it a handover certificate?
It is a signed record of the handover: the date, what was handed over and shown, what is still outstanding and the customer's satisfaction. It is not a certificate for the work itself, such as an electrical, gas or building control certificate. Share it as a PDF or a link.
How is it different from practical completion?
Practical completion is a contract milestone between the parties to a building contract. This checklist is the handover to the customer or occupier, for any size of job.
Who uses this?
Builders, renovators, kitchen and bathroom fitters, heating and renewables installers and housing providers.