Fire compartmentation survey

A fire compartmentation and fire-stopping survey, floor by floor. Record each breach with its location, element, required fire resistance, defect, services and priority, and measure the opening from a photo with an A4 sheet as the reference. The form totals breaches by priority for each floor and the building, counts the floors with a high priority breach and adds up the measured opening area for scoping the remedial work. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the compartmentation survey on your phone now

See how the compartmentation survey looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

What does a fire compartmentation survey record?

A fire compartmentation survey records each breach in the building's compartment walls, floors, risers and cavity barriers: where it is, the element and the fire resistance it needs, the type of defect, such as an unsealed service penetration or missing cavity barrier, the services through it, its size, any existing fire-stopping product or label, photos, a priority and the remedy.

Last updated . Facts checked by the SiteSurvey team on 17 October 2026 against article 17 of the Regulatory Reform (Fire Safety) Order 2005, article 9 of the Regulatory Reform (Fire Safety) Order 2005 and Approved Document B volume 2: compartmentation, cavity barriers and fire-stopping.

Built for surveying compartmentation floor by floor

Record each floor or area, then each breach on it with its photos and priority. Measure the opening from a photo with an A4 sheet on the wall, and the form totals the breaches by priority for each floor and the whole building, and adds up the opening area for scoping the remedial work.

Opening width 190 mm filled in from a photo, with the marked-up measuring photo as a thumbnail and a description of how to use an A4 sheet or ceiling tile as the reference

Opening size from a photo

Tape an A4 sheet to the wall beside the hole, photograph it square on and mark the sheet, then the opening. The result is rounded to 10 mm: good for scoping and pricing, and the installer measures before sealing. It works on web forms in any phone browser today, and the app version is on its way.

How measuring from a photo works →
Totals worked out as 4 breaches recorded, 2 high priority, 2 medium, 0 low, 2 floors with a high priority breach and 0.7 m² of measured opening, with a red note to tell the responsible person the same day

Breaches totalled by priority

Each floor shows its own count by priority and measured area. The form adds them up for the building and counts the floors with a high priority breach, with a red note to tell the responsible person the same day.

How calculated fields work →

A completed fire compartmentation survey

A fictional six storey block of flats: an unsealed riser penetration on floor 2 measured at about 190 by 320 mm from a photo, failed foam round a cable tray in the plant room, a gap in the riser floor and a missing cavity barrier in a floor 4 corridor. Open it as a filled-in form, or switch to a blank copy and try it yourself.

An unsealed hole in a blockwork riser wall with a soil pipe and cables through it, an A4 sheet taped beside it, marked up to give about 190 mm wide
C-01 floor 2 riser · about 190 mm wide
The same riser hole marked up against the A4 sheet to give about 320 mm high
C-01 · about 320 mm high
A cable tray through a plant room wall with cracked and shrunk yellow expanding foam round it
C-03 plant room · foam, high priority
A corridor ceiling void seen through a lifted tile, with the partition stopping at the ceiling grid and no cavity barrier above
C-02 floor 4 · no cavity barrier
Torch along a riser with unsealed services

Try the compartmentation survey form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Fire Compartmentation SurveyOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed compartmentation survey report (PDF), made by SiteSurvey from a fictional site visit.

Every question in the compartmentation survey template

A fire compartmentation survey: every breach in compartment walls, floors, risers and cavity barriers with its location, required fire resistance, services, size, photos, priority and the remedy. 3 sections and 50 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Client: the project's customer
  • Site: the site, when the form is opened for a space or a product
  • Site address: the site address, from the space or the project

Building and scope

  • ProjectShort answer
    Fills in from the project name
  • ClientShort answer
    Fills in from the project's customer
  • Site*Short answer
    Fills in from the site, when the form is opened for a space or a product
  • Site addressShort answer
    Fills in from the site address, from the space or the project
  • Survey date*Date
  • Surveyor and competence*Short answer
  • Building useChoose one
    • Block of flats
    • Office
    • School
    • Hospital or care home
    • Hotel
    • Industrial
    • Mixed use
  • StoreysNumber
  • Fire risk assessment referenceShort answer
  • Survey scope*Notes
  • Areas not accessedNotes
  • GuidanceCompartment walls and floors stop fire and smoke spreading through a building. Gaps, unsealed service penetrations and missing cavity barriers defeat them. Under article 17 of the Regulatory Reform (Fire Safety) Order 2005, the responsible person must, where necessary to keep people safe, have the premises and fire safety facilities maintained in efficient working order and good repair.

Floors and breaches

  • Floors and areas
    Repeat for each entry. Each one asks:
    • Floor or area*Short answer

      For example Ground floor, Floor 2, Plant room or Roof void.

    • Not accessed or limits on this floorNotes
    • Breaches on this floor
      Repeat for each entry. Each one asks:
      • Reference*Short answer
      • Scan a fire-stopping labelScan a label: label number

        Optional. Scan the label or tag to capture its numbers.

      • Room or location on this floor*Short answer
      • ElementChoose one
        • Compartment wall
        • Compartment floor
        • Ceiling
        • Riser or shaft
        • Cavity barrier
        • Fire door frame or surround
      • Required fire resistanceChoose one
        • 30 minutes
        • 60 minutes
        • 90 minutes
        • 120 minutes
        • Not known
      • Defect*Choose one
        • Unsealed service penetration
        • Failed or poor fire-stopping
        • Missing cavity barrier
        • Gap or hole
        • Damaged board or construction
        • Product not fire rated
      • Services through itTick all that apply
        • Cables
        • Plastic pipe
        • Metal pipe
        • Ductwork
        • Cable tray
        • None
      • Opening width (mm)Number

        Measure from photo works here: photograph square on with a reference in the same plane, such as an A4 sheet or a 600 mm ceiling tile. The result is rounded to 10 mm, good for scoping and pricing; the installer measures before sealing.

      • Opening height (mm)Number
      • Opening area (m²)Worked out by the form
        Shown only when the answers above make it relevant
      • Existing product or label, if anyShort answer
      • Priority*Choose one
        • High: fix now
        • Medium
        • Low
      • Recommended remedyNotes
      • PhotosPhotos
    • This floor: breachesWorked out by the form
    • HighWorked out by the form
    • MediumWorked out by the form
    • LowWorked out by the form
    • This floor: measured opening area (m²)Worked out by the form
    • Walk Cam: this floorWalk Cam video with voice-to-text

      Optional. Film a guided walk-through on the SiteSurvey app.

  • Breaches recordedWorked out by the form
  • High priorityWorked out by the form
  • MediumWorked out by the form
  • LowWorked out by the form
  • Floors with a high priority breachWorked out by the form
  • Measured opening area, all floors (m²)Worked out by the form
  • WarningHigh priority breaches recorded. Tell the responsible person the same day, and record any interim measures in the actions below.
    Shown only when the answers above make it relevant

Actions and sign-off

  • Summary for the responsible personNotes
  • Are further actions needed?Yes or No
  • Further actions
    Repeat for each action. Each one asks:
    Shown when “Are further actions needed?” is Yes
    • What needs doing?*Notes
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • Who will do it?Short answer
    • Due dateDate
    • StatusChoose one
      • Open
      • In progress
      • Completed
  • Next survey or review dueDate

    Set by the fire risk assessment, and after any building work that passes through compartment walls or floors.

  • Days until the next reviewWorked out by the form
    Shown when “Survey date” is answered and “Next survey or review due” is answered
  • CheckCheck the date. The next date is before the date of this visit.
    Shown only when the answers above make it relevant
  • Inspector nameWorked out by the form
  • Surveyor signatureSignature
  • CheckSigning records what was found on the day. It is not a guarantee of condition and does not replace any examination, test, design check or repair needed from a competent person.

See it filled in

A completed compartmentation survey report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Compartmentation survey FAQs

Why does compartmentation matter?

Compartment walls and floors stop fire and smoke spreading through a building. Gaps, unsealed service penetrations and missing cavity barriers defeat them. Under article 17 of the Regulatory Reform (Fire Safety) Order 2005, the responsible person must, where necessary for safety, keep the premises and fire safety facilities maintained in efficient working order and good repair.

How are breaches prioritised?

Each breach is high (fix now), medium or low. The form counts each, so the responsible person can see how much urgent work there is and plan the rest.

Can I record fire-stopping labels?

Yes. Each breach can scan a fire-stopping label and record the existing product. Approved Document B expects openings for pipes, ducts and cables to be as few and as small as possible and fire-stopped, and says proprietary tested fire-stopping systems may be used.

What about areas I could not get into?

Record them in the scope section. Limitations matter as much as findings, because an unseen void could hold the worst breach.

Does this replace a fire risk assessment?

No. Article 9 of the Fire Safety Order requires the responsible person to make a suitable and sufficient fire risk assessment. A compartmentation survey is a detailed look at the walls, floors, cavity barriers and fire-stopping, and the form records the fire risk assessment reference so the two are linked.

Who uses this?

Passive fire protection contractors and inspectors, fire risk assessors, building safety managers and facilities teams in blocks of flats, schools, hospitals and offices.