A site record for new electrical work that needs an Electrical Installation Certificate (EIC). Record the supply, earthing and bonding, pin a TT earth electrode on the map, then each circuit with R1 + R2, insulation resistance, polarity, Zs and RCD time. The form checks insulation resistance against the BS 7671 Table 64 minimum, Zs against the maximum you enter and RCD times against 300 ms, and counts the circuits and readings outside a limit. It is a site record, not the certificate. Try the form below, see every question or open a completed example.
✎Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.
When do you need an electrical installation certificate?
The notes on the IET model form say an Electrical Installation Certificate (EIC) is used for a new installation, for an addition or alteration that introduces one or more new circuits, and for replacing a consumer unit or distribution board. It records who was responsible for design, construction and inspection and testing, and is only valid with its schedule of inspections and schedules of circuit details and test results. An addition or alteration with no new circuit may go on a minor works certificate instead.
Built for recording new electrical work and its tests
Fill the record in at the board as you test. The form checks each circuit's readings against limits you can look up, counts the circuits and the readings outside a limit, and pins a TT earth electrode so the next person testing can find it. It is a site record of the work and the results; the certificate itself comes from your scheme's or your certification software.
Insulation resistance against Table 64
Pick the test voltage and enter the readings. The form shows the minimum from BS 7671 Table 64 (1 MΩ at 500 V or 1000 V, 0.5 MΩ for SELV and PELV at 250 V) and says whether the lower reading is below it, with a red note to investigate before the circuit goes into service.
The form compares Zs with the maximum you enter for each device and RCD times with 300 ms, then counts the circuits, passes and fails, and each kind of reading outside a limit. Any of them shows a note asking for what was found, what was done and a retest.
On a TT supply, enter the electrode resistance and mark current location at the rod or its pit. A reading above 200 Ω shows the IET note that it may not be stable. Mark current location works on web forms in any phone browser today, and the app version is on its way.
A fictional cottage on a TT supply: a new RCBO consumer unit, two new kitchen circuits and the existing circuits reconnected. One lighting circuit read 0.8 MΩ to earth, traced to a damaged loft junction box, fixed and retested. Zs is compared with the Table 41.5 value for a 30 mA RCD. Open it as a filled-in form, or switch to a blank copy and try it yourself.
This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.
Every question in the electrical installation certificate template
A site record for new electrical work that needs an Electrical Installation Certificate: scope, supply and earthing, bonding, each new circuit with its tests, inspection items, departures and the three sign-offs. 5 sections and 65 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.
✎
Make it your own: every question is editable
This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.
Details you only enter once
Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.
Project: the project name
Client: the project's customer
Site: the site, when the form is opened for a space or a product
Site address: the site address, from the space or the project
1
Work
ProjectShort answer
Fills in from the project name
ClientShort answer
Fills in from the project's customer
Site*Short answer
Fills in from the site, when the form is opened for a space or a product
Site addressShort answer
Fills in from the site address, from the space or the project
Date completed*Date
TimeTime
Contractor and registration scheme number*Short answer
Type of work*Choose one
New installation
Rewire
Addition with one or more new circuits
Consumer unit replacement
Alteration
Extent of the work covered*Notes
GuidanceThe notes on the IET model Electrical Installation Certificate say it is used for a new installation, for an addition or alteration that introduces one or more new circuits, and for replacing a consumer unit or distribution board. An addition or alteration that does not introduce a new circuit may go on a Minor Electrical Installation Works Certificate.
Is the work in a dwelling in England?Yes or No
CheckApproved Document P: in a dwelling, installing a new circuit, replacing a consumer unit, or any addition or alteration to existing circuits in a special location (such as the space around a bath or shower) is notifiable. It must be certified by a registered competent person, a registered third-party certifier or a building control body.
Shown when “Is the work in a dwelling in England?” is Yes
CheckThis is a site record of the work and test results, not the certificate itself. The formal certificate and its schedules are issued from the registration scheme's or certification software.
2
Supply and earthing
Earthing arrangement*Choose one
TN-C-S (PME)
TN-S
TT
SupplyChoose one
Single-phase
Three-phase
External earth fault loop impedance Ze (Ω)Number
Prospective fault current (kA)Number
Main switch rating (A)Number
Main earthing conductor size (mm²)Number
Earth electrode resistance (Ω)Number
Shown when “Earthing arrangement” is “TT”
CheckAbove 200 Ω. IET guidance notes that an earth electrode resistance above 200 Ω may not be stable, for example as the ground dries out or freezes. Check the electrode and the reading.
Shown only when the answers above make it relevant
Earth electrode positionShort answer
Mark current location standing at the electrode or its inspection pit, so the next person testing can find it.
Shown when “Earthing arrangement” is “TT”
Main protective bonding connected toTick all that apply
Water
Gas
Oil
Structural steel
Lightning protection
Other (describe)
None present
Distribution board or consumer unitShort answer
Scan the board labelScan a label: serial number, model number
Optional. Scan the label or tag to capture its numbers.
Photos of the board and labellingPhotos
3
Circuits and tests
Circuits
Repeat for each circuit. Each one asks:
Circuit number*Short answer
DescriptionShort answer
Protective deviceChoose one
MCB type B
MCB type C
MCB type D
RCBO type B
RCBO type C
BS 88 fuse
BS 1361 fuse
BS 3036 rewireable fuse
Other
Rating (A)Number
RCD typeChoose one
Type AC
Type A
Type F
Type B
No RCD
Live conductor (mm²)Number
Protective conductor (mm²)Number
Continuity R1 + R2 (Ω)Number
Insulation resistance test voltageChoose one
250 V
500 V
1000 V
Insulation resistance, live to live (MΩ)Number
Insulation resistance, live to earth (MΩ)Number
Minimum for this test voltage (MΩ)Worked out by the form
BS 7671 Table 64: 0.5 MΩ for SELV and PELV circuits tested at 250 V, and 1 MΩ for circuits tested at 500 V (up to 500 V) or 1000 V (above 500 V).
Shown when “Insulation resistance test voltage” is answered
Insulation resistance against the minimumWorked out by the form
Shown only when the answers above make it relevant
WarningBelow the minimum insulation resistance in BS 7671 Table 64 (1 MΩ at a 500 V or 1000 V test, 0.5 MΩ for SELV and PELV at 250 V). Investigate before the circuit is put into service.
Shown when “Insulation resistance against the minimum” is “Below the minimum”
PolarityChoose one
Correct
Fault
Earth fault loop impedance Zs, measured (Ω)Number
Maximum permitted Zs for this device (Ω)Number
From the BS 7671 tables or the device manufacturer. The form compares the measured value with what you enter here.
Measured Zs as a share of the maximum (%)Worked out by the form
Shown only when the answers above make it relevant
Zs against the maximumWorked out by the form
Shown only when the answers above make it relevant
WarningMeasured Zs is above the maximum permitted for this protective device. The device may not disconnect in time.
Shown only when the answers above make it relevant
RCD operating time at rated residual current (ms)Number
RCD time against 300 msWorked out by the form
Shown only when the answers above make it relevant
WarningOver 300 ms at the rated residual current. IET guidance gives 300 ms as the maximum for a general non-delay RCD (an S type time-delayed RCD may take up to 500 ms). Check or replace the RCD.
Shown only when the answers above make it relevant
Result*Choose one
Pass
Fail
What failed and what was doneNotes
Shown only when the answers above make it relevant
Circuits recordedWorked out by the form
Circuits failedWorked out by the form
Circuits passedWorked out by the form
Insulation resistance below the minimumWorked out by the form
Zs above the maximum enteredWorked out by the form
RCD over 300 msWorked out by the form
Polarity faultsWorked out by the form
CheckOne or more readings above are outside a limit. Each one needs a note of what was found and done, and a retest, before the circuit is put into service.
Shown only when the answers above make it relevant
GuidanceThe checks compare readings with limits you can look up: insulation resistance with BS 7671 Table 64, Zs with the maximum you enter for each device, and RCD times with 300 ms. They help spot a reading that needs a second look. They do not replace the inspector's judgement or the certificate.
4
Inspection and departures
Inspected and correct*Tick all that apply
Cables selected and installed correctly
Protective devices suit the circuits
Isolation and switching
Fire barriers and sealing
Labels and warning notices
Surge protection considered
Additional protection by RCD where required
Comments on the existing installationNotes
Defects seen in the existing installation that this work does not cover.
Shown only when the answers above make it relevant
Are there any departures from BS 7671?Yes or No
Departures and why they are acceptableNotes
Shown when “Are there any departures from BS 7671?” is Yes
Recommended date of next inspectionDate
5
Sign-off
Did one person do the design, construction and inspection and testing?Yes or No
Design: name*Short answer
If one person did the design, construction and inspection and testing, they sign here for all three.
Design: signatureSignature
Construction: nameShort answer
Shown when “Did one person do the design, construction and inspection and testing?” is No
Construction: signatureSignature
Shown when “Did one person do the design, construction and inspection and testing?” is No
Inspection and testing: nameShort answer
Shown when “Did one person do the design, construction and inspection and testing?” is No
Inspection and testing: signatureSignature
Shown when “Did one person do the design, construction and inspection and testing?” is No
Client nameShort answer
Client signatureSignature
See it filled in
A completed electrical installation certificate report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.
The IET model form has signatures for the design, the construction and the inspection and testing, and a person responsible for more than one signs in each place. A single-signature version is used where one person did all three. The form asks which applies and shows the right signature boxes.
Is this the certificate itself?
No. It is a site record of the work and the readings, with photos of the board. Issue the formal certificate and its schedules from your registration scheme's or your certification software.
Does the work need notifying?
In a dwelling in England, Approved Document P makes a new circuit, a consumer unit replacement, or an addition or alteration to circuits in a special location (such as around a bath or shower) notifiable. It must be certified by a registered competent person, a registered third-party certifier or building control. The form shows this when you say the work is in a dwelling.
What readings are recorded?
The supply: earthing arrangement, Ze, prospective fault current and main switch. Then for each circuit: device and rating, RCD type, conductor sizes, R1 + R2, insulation resistance with the test voltage, polarity, measured and maximum Zs and RCD operating time, with a pass or fail.
What does it warn about?
It flags an insulation resistance reading below 1 MΩ at a 500 V test, a measured Zs above the maximum you enter for the device, and an RCD time over 300 ms. A failed circuit asks what failed and what was done.