Skip to main content

Form library · Health and safety

Crane inspection checklist

For crane operators and people reviewing reported defects. Record crane and operator, pre-use checks and defects and handover. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the crane pre-use inspection on your phone now

See how the crane pre-use inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

Does a pre-use check replace a crane examination?

No. HSE distinguishes operator pre-use checks from maintenance, formal inspection and thorough examination. Inspection arrangements must reflect the crane, its use and manufacturer instructions. Lifting operations also need suitable planning and competent people.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE lifting operations in construction and HSE inspection of work equipment.

Built for the pre-use check in the cab

The operator works through the manufacturer's checks on a phone before the first lift: records, structure and hook, controls and limiters, outriggers and the operating area. The form counts checks needing action, records where the crane is set up and keeps the evidence.

A crane outrigger on a timber mat marked up in Measure from photo: an amber line across the 1.5 m mat and a green line from the mat to the trench edge, about 0.24 m

Mat to excavation from a photo

Photograph the outrigger with its mat in shot and tap across the mat, then to the edge of a trench or slope. Compare the figure with the lift plan, and tape it where it matters. It works on web forms in any phone browser today, and the app version is on its way.

How measuring from a photo works →
The completed pre-use check on a phone: checks acceptable 4, action needed 2, not checked 0, with a red note not to use the crane until the defect is put right

Checks needing action counted

The form counts checks acceptable, needing action and not checked. Any action brings up a reminder not to use the crane until it is put right, and a record marked ready for review with checks still open is flagged.

How calculated fields work →
Crane position on site (GPS) filled in at the north yard outrigger 3 with coordinates, Mark again and View on map

Where the crane was set up

Mark the crane's position, as a record of the set-up that was checked against the lift plan.

How GPS location works →

Film the set-up

Walk Cam records the walk round the crane with a guided point for each check and turns what you say into text.

A completed crane pre-use inspection

A fictional steel frame job: a weak hook safety catch spring replaced before the first lift, and an outrigger mat found about 0.24 m from a drainage trench, measured from a photo, so the crane was re-set 2.1 m from the edge and checked with a tape.

A yellow mobile crane outrigger on a timber mat beside an open trench and orange barrier mesh
Outrigger 3 · mat too close to trench D3 · re-set
A crane hook on its wire rope with the safety catch across the throat
Main hook · safety catch spring weak · replaced

Try the crane pre-use inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Crane Pre-use InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed crane pre-use inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the crane pre-use inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Crane Pre-use Inspection form in the SiteSurvey app on a tablet
The Crane Pre-use Inspection form in the SiteSurvey app on a phone

Every question in the crane pre-use inspection template

A crane operator pre-use record covering machine identification, manufacturer checks, visible condition, safety devices, defects and handover. 5 sections and 53 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • Weather on siteAnswer
  • CheckThis is a pre-use evidence record for a trained operator. It is not a lift plan, proof-load test, thorough examination report or certification that a crane is safe for every lift.
  • CheckSources. The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER): regulation 8 requires every lifting operation to be properly planned by a competent person, supervised and carried out safely; regulation 9 requires thorough examination by a competent person at least every 12 months (every 6 months for accessories and for equipment used to lift people) or under an examination scheme. The Provision and Use of Work Equipment Regulations 1998 (PUWER), regulation 5, requires the crane to be maintained in good repair. BS 7121-1 (Code of practice for the safe use of cranes) covers planning, checks and competence. Operator pre-use checks follow the manufacturer instructions and do not replace maintenance, inspection or thorough examination.

Crane and operator

  • Crane asset ID and location*Short answer
  • Crane position on site (GPS)Short answer

    Optional. Mark where the crane is set up, as a record of the position checked against the lift plan.

  • Make, model and crane type*Short answer
  • Scan the crane data plateScan a label: serial number, model number, asset number

    Optional. Scan the label or data plate to capture the serial and other numbers.

  • Operator and authorisation reference*Short answer
  • Manufacturer pre-use checklist reference*Short answer
  • Latest examination report reference and dateShort answer
  • Next thorough examination dueDate

    LOLER regulation 9: at least every 12 months, or every 6 months for accessories and equipment used to lift people, or as the examination scheme sets.

  • Days until the next thorough examinationWorked out by the form
    Shown when “Record date” is answered and “Next thorough examination due” is answered
  • WarningThorough examination out of date. Do not use the crane until it has a current thorough examination report.
    Shown only when the answers above make it relevant
  • Configuration, boom and attachmentsShort answer

    Identify the configuration checked and the instruction used. A check of one configuration should not be presented as covering another setup.

Pre-use checks

  • Walk Cam: crane walk-roundWalk Cam video with voice-to-text

    Optional. Film a guided walk-through on the SiteSurvey app.

  • Required examination and maintenance information available*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Visible structure, ropes, hook and connections checked to instructions*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Leaks, tyres or tracks and access checked where applicable*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Controls, stops, indicators and limiting devices checked to instructions*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Outriggers or supports and operating area considered*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Closest outrigger, mat or track to an excavation, slope or edge (m)Number

    Optional. Measure from a photo with the mat or a person in the same plane, or use a tape. Compare it with the lift plan and the manufacturer's information.

  • Outstanding defects and operating restrictions reviewed*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Supporting photosPhotos

    Required when a check needs action: photograph each defect.

  • Checks acceptableWorked out by the form
  • Action neededWorked out by the form
  • Not checkedWorked out by the form
  • WarningA check needs action. Do not use the crane until the defect is put right or a competent person has agreed it is safe, and tell the lifting supervisor.
    Shown only when the answers above make it relevant
  • WarningDefect recorded but use not stopped. A check needs action and the record status is not Work or use stopped. Record in the actions how the defect was put right, or who agreed the crane is safe to use, before any lift.
    Shown only when the answers above make it relevant

Defects and handover

  • Defects, restrictions and action takenNotes
  • Person receiving defect reportShort answer
  • How use was prevented where a defect makes operation unsafeNotes
  • Separate lift plan referenceShort answer
  • Information passed to the supervisor or next operatorNotes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • CheckA check is marked as not checked or needing action. Make sure the actions record what was done before this is marked ready for review.
    Shown only when the answers above make it relevant
  • Reviewed byShort answer
  • Date reviewedDate
  • Author signature*Signature
  • Operator nameWorked out by the form
  • Operator signatureSignature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is a pre-use evidence record for a trained operator. It is not a lift plan, proof-load test, thorough examination report or certification that a crane is safe for every lift.

What a useful entry looks like

Configuration, boom and attachments

Identify the configuration checked and the instruction used. A check of one configuration should not be presented as covering another setup.

Crane CR-04, configuration recorded on setup sheet CS-12. This record covers the checks listed in the current operator instructions only.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed crane pre-use inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Crane Pre-use Inspection FAQs

How should I record “Configuration, boom and attachments”?

Identify the configuration checked and the instruction used. A check of one configuration should not be presented as covering another setup.

Can one checklist suit every crane?

No. Identify the crane and its configuration, then use the manufacturer instructions and site arrangements. Explain any item marked not applicable or not checked.

Does the form contain a lift plan?

No. It records a separate lift-plan reference. Load, radius, configuration, ground conditions and lifting supervision require their own competent planning.

What should be recorded for a defect?

Describe the defect and evidence, who received the report, any restrictions, and how unsafe use was prevented. A completed form does not authorise continued use.

What are the limits of this template?

This is a pre-use evidence record for a trained operator. It is not a lift plan, proof-load test, thorough examination report or certification that a crane is safe for every lift.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Hazards this form covers

Who each hazard harms, what the law expects and the control measures to look for, in our hazard library.

Use this crane pre-use inspection form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →