Concrete pour checklist

For site teams recording a concrete pour. Mark the pour with GPS and enter its length, width and depth from the drawing: the form works out the volume to set against the volume ordered. Work through the pre-pour checks, which the form counts. Log each load with its ticket volume and slump test, and the form checks the slump against the range in your specification, counts rejected loads and totals the volume placed. Then record curing and the cube register references. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the concrete pour inspection on your phone now

See how the concrete pour inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

What needs to be established before a pour?

HSE identifies falsework for concrete pours as temporary works requiring planning and management. Wet cement also presents health risks. Record design, inspection and safe-work evidence before proceeding under the project’s authorised process.

Last updated . Facts checked by the SiteSurvey team on 20 October 2026 against HSE temporary works and HSE cement health risks.

Built for recording a concrete pour

Mark the pour with GPS, work out the volume from the dimensions on the drawing, then log each load with its ticket volume and slump test. The form checks every slump against the range in your specification, counts rejected loads and totals the volume placed against the volume ordered.

A load record on a phone: volume on the ticket 6 m³, slump measured 150 mm, the result Outside range, and the load marked Rejected

Slump checked against the specification

Enter the slump range from the specification once, then each load's slump test. The form shows whether it is within or outside the range, so a wet load is caught before it goes in.

How calculated fields work →
Loads recorded 4, rejected 1, slump outside range 1, volume placed 18 m³, placed minus ordered 0, with an amber note to record who authorised the decision

Loads and volume placed

The form counts the loads, the rejected loads and the slump tests outside the range, and totals the accepted ticket volumes against the volume ordered.

How calculated fields work →
Pour length 24 m, width 0.6 m and depth 1.2 m, with the volume from the dimensions 17.3 m³ and the volume ordered 18 m³

Volume from the dimensions

Enter the length, width and depth from the drawing and the form works out the volume, to check against the order before the first truck arrives.

How calculated fields work →

Film the pour

Add a short video or photos of the placement to the record, alongside the delivery tickets and the cube references.

A completed concrete pour inspection

A fictional housing site in Gloucester: three ground beams, 17.3 m³ from the drawing against 18 m³ ordered. One truck tested at 150 mm slump against the 60 to 120 mm allowed and was sent back; its replacement and the other two loads were placed, 18 m³ in all.

A slump test on site: a steel cone and base plate beside a slumped heap of fresh concrete, ground beam cages behind
Slump test at the truck
Fresh concrete flowing from a ready-mix truck chute into a ground beam trench
GB-5 · placement from the chute
Loose brick and rubble in the base of a ground beam trench around the reinforcement cage
GB-5 · rubble cleared before the pour

Try the concrete pour inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Concrete Pour InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed concrete pour inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the concrete pour inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Concrete Pour Inspection form in the SiteSurvey app on a tablet
The Concrete Pour Inspection form in the SiteSurvey app on a phone

Every question in the concrete pour inspection template

A concrete pour record covering pre-pour evidence, reinforcement and formwork checks, delivery references, placement observations, curing and hold points. 6 sections and 65 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis is an inspection record, not falsework design, structural acceptance, a concrete mix approval or a laboratory strength report.
  • CheckFalsework and formwork for the pour are temporary works and should be designed, checked and released under BS 5975:2019 (Code of practice for temporary works procedures and the permissible stress design of falsework), with a permit to load before concrete is placed. Execution of the concrete work (formwork, reinforcement, placing, compaction and curing) follows BS EN 13670 and the project specification. Slump is measured to BS EN 12350-2. HSE identifies falsework for concrete pours as temporary works needing planning and management, and wet cement can cause burns and dermatitis. Record design, inspection and safe work evidence before proceeding under the project's authorised process.
  • Weather on siteAnswer

    Note rain, frost risk or heat during placing in What you saw on site. Curing protection goes in section 5.

Pour identification

  • Pour ID, location and planned volume*Short answer
  • Pour position on site (GPS)Short answer

    Optional. Mark the pour, so the record ties to the bay, beam or base on the drawing.

  • Approved drawings, revisions and specification*Short answer
  • Specified mix and supplierShort answer
  • Slump allowed by the specification, lowest (mm)Number

    From the project specification or the slump class ordered. Used to check each load's slump test.

  • Slump allowed, highest (mm)Number
  • Inspection and test plan and hold points*Short answer
  • Pour length (m)Number

    Optional. From the drawing, for a slab bay, base or beam run.

  • Width (m)Number

    Measuring from a photo gives an estimate. Check critical sizes with a tape or laser.

  • Depth (m)Number
  • Volume from the dimensions (m³)Worked out by the form
    Shown only when the answers above make it relevant
  • Volume ordered (m³)Number
  • Walk Cam: pre-pour checkWalk Cam video with voice-to-text

    Optional. Film a guided walk-through on the SiteSurvey app.

Pre-pour checks

  • Formwork and temporary works release referenced*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Reinforcement, cover and embedded items checked to design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Construction joints and waterstops checked where specified*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Access, placement equipment and cement exposure controls ready*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Sampling, weather and curing arrangements confirmed*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Checks acceptableWorked out by the form
  • Action neededWorked out by the form
  • Not checkedWorked out by the form
  • CheckA pre-pour check needs action. Record how it was put right and who released the hold point before the pour starts.
    Shown only when the answers above make it relevant

Placement record

  • Delivery or placement record
    Repeat for each load. Each one asks:
    • Delivery ticket and batch*Short answer
    • Arrival and placement times*Short answer
    • Placement location*Short answer
    • Site tests and sample IDsShort answer
    • Volume on the ticket (m³)Number
    • Slump measured (mm)Number

      Optional. From the site slump test on this load.

    • Slump against the specificationWorked out by the form
      Shown only when the answers above make it relevant
    • LoadChoose one
      • Accepted
      • Rejected
    • Delay, rejection or deviation and authorised decisionNotes
    • is_rejectedWorked out by the form
    • is_slump_outWorked out by the form
    • vol_placedWorked out by the form
  • Loads recordedWorked out by the form
  • RejectedWorked out by the form
  • Slump outside rangeWorked out by the form
  • Volume placed (m³)Worked out by the form
  • Placed minus ordered (m³)Worked out by the form
    Shown only when the answers above make it relevant
  • CheckA load was rejected or its slump was outside the specified range. Record the decision and who authorised it in that load's record.
    Shown only when the answers above make it relevant
  • Pre-pour and placement evidencePhotos

Curing and follow-up

  • Curing and protection method and start time*Notes

    Record the specified curing arrangement, actual start and person responsible. Identify deviations from the agreed method.

  • Separate cube register and laboratory report referencesShort answer
  • Later stripping or loading authority referencesNotes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidenceNotes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is an inspection record, not falsework design, structural acceptance, a concrete mix approval or a laboratory strength report.

What a useful entry looks like

Curing and protection method and start time

Record the specified curing arrangement, actual start and person responsible. Identify deviations from the agreed method.

Curing arrangement referenced to pour plan CP-07. Start time, responsible supervisor and any change from the plan are recorded for review.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed concrete pour inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Concrete Pour Inspection FAQs

How should I record “Curing and protection method and start time”?

Record the specified curing arrangement, actual start and person responsible. Identify deviations from the agreed method.

Does this decide when formwork can be removed?

No. Record the authorised release and its engineering evidence separately.

Where are cube results kept?

Link the sample IDs to the cube register and issued laboratory reports. This form does not calculate concrete acceptance.

Does the form check the slump and the volume?

Yes, against figures you enter. Enter the slump range from the project specification or the slump class ordered, and each load's slump test shows as within or outside it. The ticket volumes of accepted loads are totalled against the volume ordered and the volume from the pour dimensions. Accepting or rejecting a load is still your decision, recorded with who made it.

What are the limits of this template?

This is an inspection record, not falsework design, structural acceptance, a concrete mix approval or a laboratory strength report.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Related templates

Structural steel inspection checklist

A steelwork inspection record linking member marks, drawing revisions, connection and coating observations, hold points, deviations and review evidence.

5 sections · 47 questions · See every question →
Welding inspection checklist

A welding inspection record with joint identification, procedure and welder references, preparation checks, visual findings, NDT links and repair history.

5 sections · 58 questions · See every question →
Concrete cube test report

A concrete cube register linking pour locations, batch tickets, sample identities, curing and laboratory references, reported results and engineer review.

5 sections · 38 questions · See every question →
Concrete pour card

A concrete pour card (pre-pour sign-off): the element, location, volume ordered, mix reference, placing method and forecast, then one sign-off per trade (formwork and shoring, reinforcement, embeds, sleeves, conduit, post-tensioning, layout, testing, engineer) with who checked, when, accepted or not, comments, photos and signature, the last checks on the day, and a release to pour calculated from the required sign-offs.

4 sections · 76 questions · See every question →
Foundation inspection checklist

A pre-pour foundation inspection: set-out, excavation safety and bearing ground, then each footing measured against its design with reinforcement, cover, formwork and penetrations checked and photographed, with US (IRC and OSHA) and UK (CDM and building control) notes, actions and sign-off.

5 sections · 84 questions · See every question →