Form library · Health and safety
Working at height rescue plan template
For people planning and reviewing rescue from work at height. Record work and scenarios, response arrangements and readiness. Try the form below, see every question or open a completed example.
Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.
Try it on your phone
Try it on this phone
Fill in the work at height rescue plan record on your phone now
See how the work at height rescue plan record looks on your phone
Scan the code with your phone camera. It opens the real form, no sign-up needed.
Open the live example and fill it in, just as your team would on site. No sign-up needed.
See it on this phoneEvery question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.
Must rescue be planned before work at height?
HSE states that work-at-height planning must include emergencies and rescue and should not rely entirely on emergency services. Plans need competent people, suitable equipment and arrangements for the actual work location.
Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE work at height and rescue planning and HSE working at height brief guide.
Try the work at height rescue plan record form live
Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.
This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.
Want to see one filled in? See a completed work at height rescue plan record report (PDF), made by SiteSurvey from a fictional site visit.
Fill it in on a phone or tablet
Your team completes the work at height rescue plan record on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.
Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.


Every question in the work at height rescue plan record template
A work-at-height rescue planning record linking credible scenarios, competent responders, approved methods, equipment readiness and briefing evidence. 6 sections and 36 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.
Make it your own: every question is editable
This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.
Details you only enter once
Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.
- Project: the project name
- Site or premises address: the site address, from the space or the project
- Client or organisation: the project's customer
Record details and scope
- ProjectShort answer
Filled in from the project in SiteSurvey.
Fills in from the project name - Site or premises addressShort answerFills in from the site address, from the space or the project
- Client or organisationShort answerFills in from the project's customer
- Record date*Date
- Person completing the record*Short answer
- CheckThis records a site-specific plan for competent review. It is not a rescue technique manual, training qualification or permission to improvise rope or lifting systems.
- CheckThe Work at Height Regulations 2005, regulation 4(1), require work at height to be properly planned, and that planning must include planning for emergencies and rescue. The Management of Health and Safety at Work Regulations 1999, regulation 8, require procedures for serious and imminent danger and enough competent people to carry them out. BS 8437 (code of practice for personal fall protection systems in the workplace) covers selecting and using fall protection and planning rescue so a casualty suspended in a harness is reached quickly. Do not rely on the emergency services alone: name the rescuers, the equipment and how they reach the casualty.
Work and scenarios
- Work location, height and access system*Short answer
- Work risk assessment and approved method reference*Short answer
- Credible rescue scenarios and access constraints*Notes
- Competent plan author and rescue lead*Short answer
Response arrangements
- Scenario responseRepeat for each scenario response. Each one asks:
- Scenario ID*Short answer
- Approved rescue method reference*Short answer
- Trained responders and availability*Short answer
- Equipment, inspection and anchor verification references*Short answer
- Access, exclusion and casualty transfer arrangements*Notes
Readiness
- Alarm, communications and emergency-service coordination*Short answer
- First-aid and receiving arrangements*Short answer
- Rehearsal or validation evidence and limitations*Short answer
Record the scenario exercised, people involved and limitations revealed. Keep the practice outcome separate from authorisation for the job.
- Readiness decision*Choose one
- Ready under approved plan
- Not ready
- Unresolved readiness gaps and work restriction*NotesShown when “Readiness decision” is “Not ready”
Briefing
- Briefed team and dateShort answer
- Next review of the rescue plan dueDate
Review when the work, team or equipment changes, or as the employer sets.
- Days to the next reviewWorked out by the formShown when “Record date” is answered and “Next review of the rescue plan due” is answered
- CheckThe next due date is before the date of this visit. Check the date.Shown only when the answers above make it relevant
- Weather, personnel or equipment changes requiring review*Notes
- Authorised review and approval referenceShort answer
Actions and review
- Are further actions required?*Choose one
- Yes
- No
- Further actionRepeat for each further action. Each one asks:Shown when “Are further actions required?” is “Yes”
- Action and evidence reference*Notes
- PriorityChoose one
- Urgent
- High
- Medium
- Low
- Person responsible*Short answer
- Target dateDate
- Action status*Choose one
- Open
- In progress
- Completed
- Completion evidence*NotesShown when “Action status” is “Completed”
- Outstanding limitations and information to pass onNotes
- Record status*Choose one
- Ready for review
- Further work needed
- Work or use stopped
- Reviewed byShort answer
- Review dateDate
- Author signature*Signature
- CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.
Scope and responsibility
This records a site-specific plan for competent review. It is not a rescue technique manual, training qualification or permission to improvise rope or lifting systems.
What a useful entry looks like
Rehearsal or validation evidence and limitations
Record the scenario exercised, people involved and limitations revealed. Keep the practice outcome separate from authorisation for the job.
Rehearsal tested the recorded access and communication arrangements. A coordination gap was identified and assigned before the readiness decision.
Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.
See it filled in
A completed work at height rescue plan record report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.
Work at Height Rescue Plan Record FAQs
How should I record “Rehearsal or validation evidence and limitations”?
Record the scenario exercised, people involved and limitations revealed. Keep the practice outcome separate from authorisation for the job.
Is calling emergency services a complete plan?
No. HSE says not to rely entirely on emergency services; the site needs suitable rescue arrangements.
Does this tell an untrained person how to rescue someone?
No. It references approved methods and trained responders.
What if the nominated rescue team is unavailable?
Record Not ready and the work restriction until arrangements are resolved and reviewed.
What are the limits of this template?
This records a site-specific plan for competent review. It is not a rescue technique manual, training qualification or permission to improvise rope or lifting systems.
Can I complete this form on site and share the record?
In the SiteSurvey app the form works offline, with signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.
Related
Hazards this form covers
Who each hazard harms, what the law expects and the control measures to look for, in our hazard library.
Related templates
Templates that go with the work at height rescue plan record form
A confined space assessment recording the task, alternatives to entry, specified hazards, controls, safe-system references and rescue planning requirements.
A site-specific rescue planning record covering the space, credible emergencies, isolation, rescuers, communications, equipment readiness and practice.
A US construction fall protection plan under OSHA subpart M: each work area at height with its height, edge and the protection chosen (guardrails, nets, personal fall arrest, covers, warning lines, safety monitoring, controlled access zones) with checks, anchorage points with their rated strength, the rescue plan, the training certification record and equipment inspections. Adds the 1926.502(k) written plan for leading edge, precast and residential work where conventional protection is infeasible.
One document for the job: hazards with suggested controls and 1 to 5 scores, the sequence of work with hold points, crew cards and competence, plant, COSHH, permits, emergency and rescue, briefing signatures and approval. Tailored to construction, electrical, AV and IT, roofing, facilities, events or grounds work.
Use this work at height rescue plan record form with your team
Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.
Start your trial →