Steps passed, failed and not tested
The form counts every step by outcome and shows the share passed, so the witnesses agree the numbers before they sign.
How calculated fields work →Form library · Quality and compliance
For people witnessing factory tests and reviewing release decisions. Record the equipment, order and approved protocol, then each test step with its criterion. For a measured step, enter the reading and the lowest or highest acceptable value, and the form shows whether it is within limits and flags a Pass outside them. It counts the steps passed, failed and not tested, shows the share passed, and warns if the decision is Accepted with a step failed or untested. Try the form below, see every question or open a completed example.
Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.
Try it on your phone
Try it on this phone
Fill in the factory acceptance test record on your phone now
See how the factory acceptance test record looks on your phone
Scan the code with your phone camera. It opens the real form, no sign-up needed.
Open the live example and fill it in, just as your team would on site. No sign-up needed.
See it on this phoneEvery question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.
HSE explains that products must meet applicable supply legislation. A customer’s factory acceptance test records agreed checks; it does not by itself establish conformity with all relevant legal requirements.
Last updated . Facts checked by the SiteSurvey team on 20 October 2026 against HSE product design and supply law and HSE inspection of work equipment.
Record each test step against the approved protocol. For a measured step, enter the reading and the limits from the specification and the form shows whether it is within them. It counts the steps passed, failed and not tested, shows the share passed, and warns if the decision is Accepted while a step failed or was not tested.

The form counts every step by outcome and shows the share passed, so the witnesses agree the numbers before they sign.
How calculated fields work →
Enter the measured value and the lowest or highest acceptable value from the specification. The form shows within or outside the limits and flags a step marked Pass that is outside them.
How calculated fields work →Add videos and photos as evidence for each step, such as the emergency stop test or the panel during the run.
A fictional case packing cell: emergency stops and a 21.4 cases per minute run passed, the guard door alarm showed the wrong door and failed, and the changeover test moved to site acceptance. Accepted with recorded conditions, dispatch still to be authorised.


Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.
This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.
Want to see one filled in? See a completed factory acceptance test record report (PDF), made by SiteSurvey from a fictional site visit.
Your team completes the factory acceptance test record on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.
Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.


A factory acceptance test record linking equipment, approved test procedures, witnessed results, deviations, retests and dispatch decisions. 5 sections and 48 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.
This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.
Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.
Filled in from the project in SiteSurvey.
Optional. For a measured step, such as a speed, time, pressure or count.
List unresolved items and the evidence needed to close them. Separate acceptance of witnessed tests from permission to dispatch.
This records tests against a supplied specification. It is not a declaration of conformity, machinery safety assessment or automatic authorisation to dispatch equipment.
Conditions and authorised decision reference
List unresolved items and the evidence needed to close them. Separate acceptance of witnessed tests from permission to dispatch.
Witnessed tests are recorded against protocol FAT-08. Item P-03 remains open pending the agreed retest evidence; dispatch review is recorded separately.
Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.
A completed factory acceptance test record report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.
List unresolved items and the evidence needed to close them. Separate acceptance of witnessed tests from permission to dispatch.
The approved specification and test protocol. Record the exact revision and criterion for every step. For a measured step, enter the limits from that document and the form compares the reading with them; it does not set limits of its own.
Keep the original result and link a separate retest record. Record any authorised deviation explicitly.
No. Factory testing occurs before site installation. Record site acceptance and commissioning separately.
This records tests against a supplied specification. It is not a declaration of conformity, machinery safety assessment or automatic authorisation to dispatch equipment.
In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.
Related templates
A site acceptance test record linking installed equipment, approved test cases, expected results, observed evidence, deviations and acceptance decisions.
A first article inspection record with part and drawing revisions, material traceability, characteristic measurements, deviations and customer disposition.
A measurement-equipment record linking instrument identity, calibration certificates, check results, acceptance decisions and out-of-tolerance follow-up.
Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.