Skip to main content

Form library · Construction and handover

Design risk register template

For designers and people coordinating design risk information. Record design scope, design decisions and communication and closure. Try the form below, see every question or open a completed example.

Ready to use from the form library, and every question is yours to edit. Try it for a small trial fee, cancel any time.

Try it on your phone

Try it on this phone

Fill in the design risk register on your phone now

See how the design risk register looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

One email, and we won't add you to a mailing list.

What do CDM designer duties involve?

HSE explains that designers must consider foreseeable risks and eliminate them where possible, then reduce or control those that remain. Relevant information must be communicated to other dutyholders. A register records decisions but does not discharge those duties on its own.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE designer duties and HSE CDM 2015 guidance.

Try the design risk register form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Design Risk RegisterOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed. Or open a completed example to see every answer, photo and score filled in.

Want to see one filled in? See a completed design risk register report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the design risk register on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Design Risk Register form in the SiteSurvey app on a tablet
The Design Risk Register form in the SiteSurvey app on a phone

Every question in the design risk register template

A design risk register linking design decisions, foreseeable lifecycle hazards, elimination options, residual risks, drawings and dutyholder communication. 5 sections and 41 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis supports CDM design coordination in Great Britain. It is not a design approval, substitute for engineering judgement or a claim that every hazard has been eliminated.
  • CheckSources. The Construction (Design and Management) Regulations 2015 (CDM 2015), regulation 9: designers must take account of the general principles of prevention, eliminate foreseeable risks to anyone building, maintaining, cleaning, using or demolishing the structure where reasonably practicable, reduce or control the risks that remain, and give information to the principal designer and others. Regulation 11: the principal designer must plan, manage, monitor and coordinate health and safety in the pre-construction phase. HSE guidance L153 (Managing health and safety in construction) explains both duties. A register records decisions but does not discharge them.

Design scope

  • Design package and stage*Short answer
  • Designer and organisation*Short answer
  • Drawing or model revision*Short answer
  • Principal designer and coordination referenceShort answer

Design decisions

  • Design risk
    Repeat for each design risk. Each one asks:
    • Risk ID and design element*Short answer
    • Lifecycle phase*Choose one
      • Construction
      • Use
      • Maintenance
      • Demolition
    • Foreseeable hazard and people affected*Notes
    • Elimination options considered and decision*Notes
    • Remaining risk and design controls*Notes
    • Residual risk ratingChoose one

      This form's own scale.

      • High
      • Medium
      • Low
    • StatusChoose one
      • Open
      • Closed
    • Decision owner*Short answer
    • Drawing, specification or model referenceShort answer
  • Design risksWorked out by the form
  • OpenWorked out by the form
  • Residual HighWorked out by the form
  • Construction phaseWorked out by the form
  • Use phaseWorked out by the form
  • Maintenance phaseWorked out by the form
  • Demolition phaseWorked out by the form

Communication and closure

  • Significant information issued and recipients*Notes

    Communicate the remaining risk in terms the receiving team can use. Reference the relevant design decision and current document.

  • Coordination review and dateShort answer
  • Open interfaces and decisions requiredNotes
  • How design changes trigger reviewNotes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • PriorityChoose one
      • Urgent
      • High
      • Medium
      • Low
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidenceNotes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This supports CDM design coordination in Great Britain. It is not a design approval, substitute for engineering judgement or a claim that every hazard has been eliminated.

What a useful entry looks like

Significant information issued and recipients

Communicate the remaining risk in terms the receiving team can use. Reference the relevant design decision and current document.

Residual maintenance-access risk identified against design decision DR-12. Current drawing and the required handover information are referenced for the receiving team.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed design risk register report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Design Risk Register FAQs

How should I record “Significant information issued and recipients”?

Communicate the remaining risk in terms the receiving team can use. Reference the relevant design decision and current document.

Must every ordinary site hazard be duplicated here?

Focus the register on design decisions and relevant information. It should support useful coordination rather than copy generic site precautions.

Does a low score prove the design is safe?

No automatic risk score is supplied. Record the reasoning, controls and unresolved matters.

Who receives residual-risk information?

Record the relevant dutyholders and the drawings or documents used to communicate it.

What are the limits of this template?

This supports CDM design coordination in Great Britain. It is not a design approval, substitute for engineering judgement or a claim that every hazard has been eliminated.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Hazards this form covers

Who each hazard harms, what the law expects and the control measures to look for, in our hazard library.

Use this design risk register form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →